S3 Assembly/Repair Checklist
(File With Project/Maintenance Records)
Performed by:
Date:
Location:
______________________________________________________________________
□
1.
Ensure only Trinity Highway CASS
®
S3 parts are used for the assembly/repair of CASS
®
S3
and that all parts are free of damage. (p 4)
□
2.
Ensure required traffic control is in place to conduct CASS
®
S3 assembly/repair. (p 4)
□
3. Ensure proper site grading for the CCT complies with state/specifying agency guidelines for
guardrail terminals or AASHTO Roadside Design Guide, whichever is more stringent. (pp 5
&14)
□
4.
Ensure proper site grading for the CASS
®
S3 complies with state/specifying agency
guidelines or AASHTO Roadside Design Guide. (pp 5 & 14)
□
5.
Ensure the Sleeve Cover is paced on the post and is flush with the top of the Post Sleeve.
(p 17).
□
6. Ensure the Bottom CRP and Top CRP are oriented correctly. (p 18)
□
7.
Ensure the top of the Bottom CRP’s does not protrude more than 4” [100 mm] above the
finished grade. (p 18)
□
8.
Ensure the bent part of the Cable Anchor Bracket at CRP’s is up and hooked over the Top
CRP’s. (pp 21 & 22)
□
9.
Ensure two (2) 1” Hex Nuts have been placed on the ends of the cable fittings at the CRP’s.
(p 22)
□
10. Ensure the cables are located and assembled at the proper holes of the Terminal Line Posts
with the Cable Lock Bolts. (pp 21 & 22)
□
11. Ensure that the Field Applied Fittings have a single cable strand bent over the wedge. (p 24)
□
12. Ensure the bottom cable is located on the non-traffic side of the post and the high bottom
cable is located on the traffic side of the post. (p 26)
□
13. Ensure Cable Spacer is placed between the top two (2) cables. (p 26)
□
14. Ensure the CASS
®
S3 delineators are placed per the contract plans. (p 26)
□
15. Ensure the Stainless Steel Post Strap is placed above the top cable. (p 26)
□
16. Ensure the Fittings are a minimum of 1 1/2” [38 mm], maximum of 4” [100 mm] into the
turnbuckle. (p 28)
□
17. Ensure the Tension on the cable has been checked and is as specified in the “CASS
®
S3
Temperature/Tension Chart”. (p 28)
□
18. Ensure there are no damaged/frayed/bent cables. (p 28)
□
19. Ensure delineation is placed on CASS
®
S3 CRP’s and line post per MUTCD and/or
state/specifying agency. (p 28)