Trine Axion Series Instruction Manual Download Page 3

Wire

Latch

Cont... Page 2 

Door Handing Determination

The position of the Electric Strike in the door 

jamb will be the same for a right-handed door 

and a lefthanded door. For these installations, 

the Electric Strike position in the door jamb 

will be as shown in Figure 3.

In a similar manner, the position of the Electric 

Strike in the door jamb will be the same for a 

lefthanded reverse bevel door and a right 

-handed door. For these installations, the 

Electric Strike position in the door jamb will be 

as shown in figure (4).

NOTE

The EN Electric Strike must be installed with 

coil assembly up (wiring toward top of unit). In 

this position, the Electric Strike will be locked 

without power, Fail Secure, or locked with 

power, Fail Safe action.  Before performing 

Handing Procedure, view Electric Strike in up 

position (wire leads at top) to determine if a 

handing change is required.

Figure 3. 

Position of 

Electric Strike 

for Right Hand 

Inswinging and 

Left Hand 

Outswinging 

Door

Figure 4. 

Position of 

Electric Strike 

for 

Left Hand

 

Inswinging and 

Right Hand 

Outswinging 

Door

Wire

Latch

400RP

400RP

400

400

Figure 10a. USING  DC TRANSFORMER

SAMPLE WIRING DIAGRAMS

FOR THE EN SERiES

Figure 10b. USING  AC TRANSFORMER

24V DC OR 12V DC

TRANSFORMER

TO 120V AC LINE

PUSH

BUTTON

NORMALLY OPEN

** When wiring the optional buzzer, polarity must be 

observed. Connect the (+ or RED) positive wire to the 

(+) positive side of the circuit and the (- or BLACK) 

negative side wire terminal to the negative side of the 

circuit.

+

-

+

RED

-

BLACK

FAIL-SECURE

ELECTRIC

STRIKE

OPTIONAL**

BUZZER: BZ-12 OR BZ-24

OPTIONAL** BUZZER: BZ-12 OR BZ-24 BZ-6 FOR LC VERSION

FAIL-SAFE

ELECTRIC

STRIKE

RECTIFIER*

24V AC or 12V AC Transformer

TO 120V AC LINE

PUSH

BUTTON

NORMALLY OPEN

* The rectifier can be positioned before of after the push button in the circuit. The LC 

module can ONLY be positioned after the push button as shown above.

*** When wiring the optional buzzer, 

polarity must be observed

. Connect the (+ or 

RED) positive wire to the (+) positive side of the circuit and the (- or BLACK) negative 

side wire terminal to the negative side of the circuit.

+

-

+

RED

-

BLACK

INSTALLATION PROCEDURE:

- For new or replacement installation in wood 

or metal jambs.

1. Verify that voltage rating of Electric Strike is 

compatible with supply voltages of installtion.  

Coil voltages are color coded.

  WIRE LEAD 

CODE/STRIPE

  12AC   

Blue/Orange Stripe

  12DC    

2 Orange Stripe

  24AC    

Blue/Black Stripe

  24DC    

2 Black Stripe

2. Using template supplied with Electric Strike, 

mark door jamb for cutout and screw holes.

NOTE

For proper installation, center line of latches must 

be aligned with center line of Electric Strike.

3. Prepare door frame (cut out jamb if 

required) for Electric Strike. Leave sufficient 

space for splicing between power supply 

wiring and Electric Strike wiring.

4. If required, run new wiring to door frame 

mounting hole. See figure 10 for typical wiring 

installations. Refer to wiring chart below for 

correct wire size. (Total wiring length includes 

routing to door-release push button).

Total Wiring Length

  To Transformer  12V 

  24V

  Up to 50 Ft 

18AWG    20AWG

  50 to 150 ft  

16AWG    18AWG

  150 to 300 ft   14AWG    16AWG

  300 to 600 ft   12AWG    14AWG

NOTE

For DC operation, to obtain an audible 

signal when Electric Strike is energized, 

install buzzer type BZ-12 for 12VDC 

operation, or BZ-24 for 24VDC operation 

(purchased seperately), as illustrated in 

figure 10. 5. Hold Electric Strike upright 

(wiring toward top) and determine if 

handing is required. If so, perform handing 

procedure. 

6. Splice Electric Strike wiring to supply 

wiring. Secure with wire nuts (supplied).

7. For wood and aluminum door jambs, drill 

pilot holes for securing Electric Strike to 

door jamb. For steel and aluminum door 

jambs, secure Electric Stike to existing 

mounting tabs.

8. Install Electric Strike into door jamb and 

secure with flat head mounting screws 

(supplied).

9. Verify that door operates correctly when 

Electric Strike is energized and not 

energized.

NOTE

1. Rectifier can be located either between 

transformer and push button, or between 

push button and electric strike.

2. Use either a silicon rectifier or a current 

regulating rectifier for converting the AC 

voltage at the transformer secondary to 

the DC for operating the electric strike.