Date: April, 2016 Doc No: PS-M-0433 Ver. A Page - 5 - of 10
Racking
Material: Q235B
(Supply By EPC or
Racking suppliers)
With hook
installation
6.2
MOUNTING METHODS
Please read this chapter in its entirety to familiarize you with the process before beginning the installation. Also, be sure that
the site has been completely prepared before beginning the installation.
STEP 1: Install the specified bolts
Setting the specified bolts into
the hook.
STEP 2: Insert the bolt hole
1. Lift up the module; ensure the
bolt over the racking.
2. Aim the bolt to racking.
3. Insert the bolt hole
STEP 3: Tighten the nut (M8:Tighten to a torque of 16~20N*m; M10: Tighten to a torque of 20~25N*m)
Move
Insert
Lift