Fig. No 2 Layout of external connectors of the multichannel receiver
The switch mounted on the rear board of the receiver is used for power supply
from AC network.
Mounting of the multichannel receiver and preparation to work
The multichannel receiver is necessary to be equipped in the centralized
monitoring station. Work position - horizontal. Devices, worsening cooling or being
capable of deforming the lid, can not be put on the receiver. Grounding must be
connected to the receiver.
PC, operating with centralized monitoring program and needle printer are
necessary in the centralized monitoring station for data processing. The printer,
connected to the receiver, will print each received message. If printed archive is not
necessary, the printer may not be connected.
The reception modules are built-in the receiver, connective cables and
necessary antennas are connected. Some of the exploitation parameters of the receiver
may be changed using programing device SPROG-1 and the program Hyper Terminal.
Connect AC network to the multichannel receiver via special cable and switch on
the power supply on the rear board.
Connect backup DC source or battery. Hermetic battery of 12 V voltage and 7Ah
capacitance, operating in continuous mode must be used (e.g. Power Sonic PS-1270,
Alarm Supplies PB12-7).
ATTENTION:
The housing of the receiver must be grounded before connecting power supply
from AC network.
Before unscrewing lids of the receiver it is necessary to switch off voltage by fully
unplugging AC cable.
Setting of exploitation parameters
Exploitation parameters of the RG3 module are set using programing device
SPROG-1 and standard Windows program
Hyper Terminal.
The program in
WINDOWS’9x’NT versions can be found according to the following commands:
Start/
Programs/ Accessories/Communications/ Hyper Terminal
TRIKDIS
Draugystės g. 17, LT-51229 Kaunas, Lietuva, tel. 8-37-408040, faks. 8-37-760554
el. paštas:
,
www.trikdis.lt
10