Inverter Trienergia SunUno Plus Series 

 

 
 

- 0 -

 

 

 

 

 

 

 

 

 

 

 

 

 

Operating Manual 

 

Inverter Trienergia

 

SunUno Plus Series 

Summary of Contents for SunUno Plus 1.5K

Page 1: ...Inverter Trienergia SunUno Plus Series 0 Operating Manual Inverter Trienergia SunUno Plus Series ...

Page 2: ...tion for installation operation maintenance trouble shooting and safety Please follow the instructions of this manual so that we can ensure delivery of our professional guidance and wholehearted service Customer orientation is forever our commitment We hope this document proves to be of great assistance in your journey for a cleaner and greener world Please check for the latest version at www coen...

Page 3: ...on Scope of Products 9 3 2 Specification for Product Model 10 3 3 Overview and Dimensions of products 10 3 4 Datasheet 11 Chapter 4 Instructions for installation 17 4 1 Safety Instructions 17 4 2 Pre installation Check 17 4 3 Installation and Placement Method 18 4 4 Mounting Procedure 19 Chapter 5 Electrical Connection 24 5 1 Safety Instruction for live line 24 5 2 Specifications for Electrical In...

Page 4: ...troduction of display Interface 31 6 2 First Run Setup 32 6 3 Monitoring Operation 40 Chapter 7 Fault Code and Troubleshooting 41 Chapter 8 Recycling and Disposal 44 Chapter 9 Guarantee Service 44 Chapter 10 Contact TRIENERGIA 45 TRIENERGIA Inverter Warranty Policy 46 Warranty Card 50 ...

Page 5: ...2500M1 SunUno Plus 3K TR 3000M1 SunUno Plus 3K M TR 3000M2 SunUno Plus 4K M TR 4000M2 SunUno Plus 5K M TR 5000M2 SunUno Plus 6K M TR 6000M2 Please keep this manual all time available in case of emergency 1 2 Safety Instructions DANGER DANGER indicates a hazardous situation which if not avoided will result in death or serious injury WARNING WARNING indicates a hazardous situation which if not avoid...

Page 6: ...on that can result in potential damage if not avoided 1 3 Target Group Only qualified electricians who have read and fully understood all safety regulations contained in this manual can install maintain and troubleshoot the inverter Operators must be aware of the live device ...

Page 7: ...he installation service recycling and disposal of the inverters must be performed by qualified personnel only in compliance with national and local standards and regulations Any unauthorized actions including modification of product functionality of any form may cause lethal hazard to the operator third parties the units or their property Coenergia S r l are not responsible for the loss and these ...

Page 8: ...ts inside the inverter will release a lot of heat during operation Do not touch metal plate housing during operating An error has occurred Please go to Chapter 9 Troubleshooting to remedy the error This device SHALL NOT be disposed of as residential waste Please go to Chapter 8 Recycling and Disposal for proper treatments Without Transformer This inverter does not use transformer for the isolation...

Page 9: ...s with the safety instructions from China s Quality Center No unauthorized operations or modifications Any unauthorized operations or modifications are strictly forbidden if any defect or damage device person occurs Coenergia S r l shall not take any responsibility for it ...

Page 10: ...ith the requirements of public grid and the AC power can feed the grid Table 3 1 shows the structural diagram of the typical application system of SunUno Plus inverters Name Description Remarks A Solar panels Monocrystalline or polycrystalline silicon and thin film PV modules with Class II protection and need no functional ground connection B Inverters Inverter Trienergia SunUno Plus 1K 1 5K 2K 2 ...

Page 11: ...er is equipped with one only MPPT M xxxxM2 represents the inverter is equipped with two MPPT 3 3 Overview and Dimensions of products The dimensions of Trienergia SunUno Plus series products is shown in Figure 3 2 A B SunUno Plus 1K 1 5K TR xxxxM1 SunUno Plus 2K 2 5K 3K TR xxxxM1 C SunUno Plus 3K M 4K M 5K M 6K M TR xxxxM2 Figure 3 2 Dimensions of Trienergia SunUno Plus series Products ...

Page 12: ...Voltage V 50 Max DC Input Current A 11 Number of DC Connection Sets per MPPT 1 Number of MPPT 1 DC Switch Integrated Output AC Rated AC Power W 1000 1500 Max AC Power W 1100 1650 Rated AC Current A 4 3 6 5 Max AC Current A 5 3 7 9 Nominal AC voltage range 220V 230V 240V 180V 280V Grid frequency range 50Hz 60Hz 5Hz Power factor cos φ 0 99 full load Total Harmonic Distortion THDi 3 Feed in 1L N PE E...

Page 13: ...rd WiFi Optional General Data Topology Transformerless Consumption at Night W 0 2 Consumption at Standby W 6 Operating Temperature Range 25 C to 60 C 45 C to 60 C with derating Cooling Method Natural Convection Ambient Humidity 0 to 100 Non condensing Altitude Up to 2000m without derating Noise dBA 15 Ingress Protection IP65 Indoor Outdoor Installation Mounting Rear Panel Dimensions H W D mm 315 2...

Page 14: ...oltage V 50 Max DC Input Current A 11 Number of DC Connection Sets per MPPT 1 Number of MPPT 1 DC Switch Integrated Output AC Rated AC Power W 2000 2500 3000 Max AC Power W 2200 2750 3300 Rated AC Current A 8 7 10 9 13 0 Max AC Current A 10 6 13 3 15 9 Nominal AC voltage range 220V 230V 240V 180V 280V Grid frequency range 50Hz 60Hz 5Hz Power factor cos φ 0 99 full load Total Harmonic Distortion TH...

Page 15: ...iFi Optional General Data Topology Transformerless Consumption at Night W 0 2 Consumption at Standby W 6 Operating Temperature Range 25 C to 60 C 45 C to 60 C with derating Cooling Method Natural Convection Ambient Humidity 0 to 100 Non condensing Altitude Up to 2000m without derating Noise dBA 25 Ingress Protection IP65 Indoor Outdoor Installation Mounting Rear Panel Dimensions H W D mm 354 305 1...

Page 16: ...d AC Power W 3000 36801 4000 46002 5000 6000 Max AC Power VA 3300 3680 4400 4600 5500 6000 Rated AC Current A 13 0 16 0 17 4 20 0 21 7 26 1 Max AC Current A 15 9 16 0 21 0 22 2 26 7 28 7 Nominal AC voltage range 220V 230V 240V 180V 280V Grid frequency range 50Hz 60Hz 5Hz Power factor cosφ 0 8 leading 0 8 lagging Total Harmonic Distortion THDi 3 Feed in 1L N PE Efficiency Max Efficiency 97 6 97 8 9...

Page 17: ... Convection Ambient Humidity 0 to 98 Non condensing Altitude Up to 2000m without derating Noise dBA 25 Ingress Protection IP65 Indoor Outdoor Installation Mounting Rear Panel Dimensions H W D mm 454 355 150 454 355 162 Net Weight kg 14 8 15 8 Standard Warranty Year 5 Standard 10 15 20 25 Optional Certificates IEC62109 1 2 IEC61000 6 2 3 IEC61683 IEC60068 2 IEC62116 IEC61727 PEA MEA NRS 097 2 1 UTE...

Page 18: ... II Inappropriate or unharmonized installation environment may jeopardize the life span of the inverter Installation directly exposed under intensive sunlight is not recommended The installation site must be well ventilated 4 2 Pre installation Check 4 2 1 Check the Package Although TRIENERGIA s inverters have surpassed stringent testing and are checked before they leave the factory it is uncertai...

Page 19: ... inverter at eye level for convenience when checking the LCD display and possible maintenance activities 4 When mounting the inverter please consider that disassembly for service work may be required 4 3 2 Installation Position Do not expose the inverter to direct solar irradiation as this could cause power derating due to overheating The ambient temperature should be between 25 C 60 C 13 F 140 F ...

Page 20: ... Figure 4 2 Minimum Clearance 4 4 Mounting Procedure 4 4 1 Mark the Positions of the Drill Holes of the Rear Panel The mounting position should be marked as shown in Figure 4 3 Figure 4 4 Figure 4 5 Figure 4 3 Dimensions of rear panel of SunUno Plus 1K 1 5K TR xxxxM1 ...

Page 21: ...ear panel of SunUno Plus 3K M 4K M 5K M 6K M TR xxxxM2 4 4 2 Drill Holes and Place the Expansion Tubes According to the guides drill 3 holes in the wall in conformity with position marked in Figure 4 6 4 7 4 8 and then place expansion tubes in the holes using a rubber mallet Figure 4 6 Drill holes dimensions of SunUno Plus 1K 1 5K TR xxxxM1 ...

Page 22: ...xxxxM1 Figure 4 8 Drill holes dimensions of SunUno Plus 3K M 4K M 5K M 6K M TR xxxxM2 4 4 3 Mount the Screws and the Rear Panel The panels should be mounted in the mounting position by screws as shown in Figure 4 9 Figure 4 10 and Figure 4 11 Figure 4 9 Mount the Rear Panel of SunUno Plus 1K 1 5K TR xxxxM1 ...

Page 23: ...5K 3K TR xxxxM1 Figure 4 11 Mount the Rear Panel of SunUno Plus 3K M 4K M 5K M 6K M TR xxxxM2 4 4 4 Mount the Inverter Carefully mount the inverter to the rear panel as shown in Figure 4 12 Figure 4 13 Figure 4 14 Make sure that the rear part of the equipment is closely mounted to the rear panel ...

Page 24: ...nergia SunUno Plus Series 23 Figure 4 12 Mount SunUno Plus 1K 1 5K TR xxxxM1 inverter Figure 4 13 Mount SunUno Plus 2K 2 5K 3K TR xxxxM1 inverter Figure 4 14 Mount SunUno Plus 3K M 4K M 5K M 6K M TR xxxxM2 inverter ...

Page 25: ...e or electricity shock When power on the equipment should be in conformity with national rules and regulations The direct connection between the converter and high voltage power systems must be operated by qualified technicians in accordance with local and national power grid standards and regulations WARNING When the photovoltaic array is exposed to light it supplies a d c voltage to the inverter...

Page 26: ...nterface Figure 5 1 Electrical Interface of SunUno Plus 1K 1 5K 2K 2 5K 3K TR xxxxM1 Figure5 2 Electrical Interface of SunUno Plus 3K M 4K M 5K M 6K M TR xxxxM2 Table 5 1 Specifications for Interface Code Name A DC Input B DC Switch optional C RS232 Wi Fi Port D AC Plug Terminal ...

Page 27: ...de Diameter of the Cables mm Scope Recommended Value 4 0 6 0 4 0 4 2 5 3 Table 5 2 Recommended Specifications of AC Cables 5 3 1 Feed the AC cable through the AC waterproof hole Figure 5 3 Thread the cables 5 3 2 Connect the cables according to connection marks of L N and PE Figure 5 4 Connect the Cables ...

Page 28: ... Then the connection of AC cable is complete Figure 5 6 Connect the Inverter 5 4 DC Side Connection Cross sectional Area of Cables mm Outside Diameter of the Cables mm Scope Recommended Value 4 0 6 0 4 0 4 2 5 3 Table5 3 Recommended Specifications of DC Cables DC connector is made up of the positive connector and the negative connector 1 Insulated Enclosure 2 Lock Screw 3 Positive Connector Figure...

Page 29: ...onnect the positive connector to the positive side of the solar panels and connect the negative connector to the negative side of the solar side Be sure to connect them in right position Connecting Procedures 1 Tighten the lock screws on positive and negative connector 2 Use specified strip tool to strip the insulated enclosure of the positive and negative cables with appropriate length 1 Positive...

Page 30: ...relevant insulated enclosure a click should be heard or felt when the contact cable assembly is seated correctly 6 Fasten the lock screws on positive and negative connectors into respondent insulated enclosure and make them tight 7 Connect the positive and negative connectors into positive and negative DC input terminals of the inverter a click should be heard or felt when the contact cable assemb...

Page 31: ...dy 4 DTR Data Terminal 5 GND Signal Ground 6 DSR Data Send Ready 7 RTS Request To Send 8 CTS Clear To Send 9 RI Ring Indicator Table 5 5 Instruction of Nine Serial Port Pins 1 RS232 can externally connect with Wi Fi module For more details please refer to the operating manual of Wi Fi module 2 RS232 can externally connect with Wi Fi module For more details please refer to the operating manual of E...

Page 32: ...w LED light Power After the device is powered on the yellow LED light will go on B Red LED light Error The red LED light will go on when an Error occurs it will go off automatically after Errors are resolved C Green LED light operation The green LED light will go on when the equipment is in normal operation D The LCD shows the operational data recorded information and parameters E Exit button F En...

Page 33: ...rease the setting value Press time longer than 1 second Enter into the sub menu or confirm order Table 6 2 Instructions for buttons 6 2 First Run Setup 6 2 1 Set the Country Figure 6 2 Set The Country Please press the ENT button LCD will show the countries for option Users can press or to move the cursor to select the correct country and press ENT button to confirm the selection Note The configura...

Page 34: ...y displays the inverter operation status Normal Wait Fault Update Data name Explanation Normal The inverter in normal function operation Wait The inverter in stand by state Fault A fault occurs during operation Update The state of updating firmware Turn on the AC switch the LCD begins to count seconds backward after this the inverter begins to connect the gird Figure 6 3 Count down Seconds ...

Page 35: ...ompliance Change Password Clear Errors Clear Energy Factory Setting Modbus Address E Today E Month E Year E Total ENT ENT Machine Type Grid Compliance SN code Product Code Firmare Ver E Today 0 05 kWh E Month 685 2 kWh 02 01 kWh T Total 4588h Error Code 24 No Grid Err M Please Enter Password XXXXXX Machine Type Sununo Plus 5K M Grid Compliance China SN 15020G1502EN 00001 PC SU05KMTL1E N6ED0000 MCU...

Page 36: ...today 0 05kWh P ac 3210W Set Param Inverter Info Language Date Date 2015 01 01 Are you sure to set it Set Complete ENT ENT ENT ESC Language Date ENT ENT ENT E today 0 05kWh P ac 3210W Set Param Inverter Info Are you sure to set it Set Complete ENT ENT ENT ENT Language Date ESC ENT ESC Time Grid Compliance Please Enter Password XXXXXX Australia Austria China ENT ENT 6 2 4 Settings of General Parame...

Page 37: ...ear Errors Are you sure to set it Set Complete ENT E today 0 05kWh P ac 3210W Set Param Inverter Info ENT ENT ENT Language Date ESC Are you sure to set it Set Complete ENT Clear Energy Factory Setting E today 0 05kWh P ac 3210W Set Param Inverter Info ENT ENT ENT Language Date ESC Clear Energy Factory Setting Please Enter Password XXXXXX Are you sure to set it Set Complete ENT ENT Reset Password C...

Page 38: ... 59 S1 Please Wait Test passed ENT E today 0 05kWh P ac 3210W Peripheral Self Test ENT ENT ENT 3 Uvp 27 S1 4 Uvp2 27 S2 ENT Uvp 27 S1 0 0 result Uvp 27 S1 1 1 test 3 Uvp 27 S1 Please Wait Test passed ENT E today 0 05kWh P ac 3210W Peripheral Self Test ENT ENT ENT 3 Uvp 27 S1 4 Uvp2 27 S2 ENT Uvp2 27 S2 0 0 result Uvp2 27 S2 1 1 test 4 Uvp2 27 S2 Please Wait Test passed ENT 6 2 5 Self test of the I...

Page 39: ... 1 1 test 6 Ofp2 81 S2 Please Wait Test passed ENT E today 0 05kWh P ac 3210W Peripheral Self Test ENT ENT ENT 7 Ufp 81 S1 8 Ufp2 81 S2 ENT Ufp 81 S1 0 0 result Ufp 81 S1 1 1 test 7 Ufp 81 S1 Please Wait Test passed ENT E today 0 05kWh P ac 3210W Peripheral Self Test ENT ENT ENT 7 Ufp 81 S1 8 Ufp2 81 S2 ENT Ufp2 81 S2 0 0 result Ufp2 81 S2 1 1 test 8 Ufp2 81 S2 Please Wait Test passed ENT Over fre...

Page 40: ...connected state 3 All test is starting from the item 1 to item 8 of the autotest 4 The self test information could be reviewed after successful setting Self test from item 1 to item 8 could only show the test results of each item respectively By All test all test results from item 1 to item 8 could be checked all at once as example over voltage protection test E today 0 05kWh P ac 3210W Peripheral...

Page 41: ...web portal or mobile remotely The equipment can be connected to local internet via Ethernet module and the Wi Fi web server which is embedded in the machine following this the operational status of the inverter can be monitored By connecting the Internet through Ethernet module and uploading the inverter data to the server users can monitor the operational information of the inverter by web versio...

Page 42: ... High M Average voltage of 10 minutes High Master 18 Freq High M Frequency High Master 19 Freq Low M Frequency LowMaster 24 No Grid Err M Grid Lost Error Master 27 GFCI Error M GFCI Error Master 28 DCI Error M DCI Error Master 31 ISO Error M Insulation Error Master 33 Bus Volt High M Bus Voltage High Master 35 Current High M Current High Master 38 HW Bus Volt High M Bus Voltage High Of Hardware Ma...

Page 43: ...ature High Error Check whether the radiator is blocked whether the inverter is in too high or too low temperature if the above mentioned are in normal please contact your distributor or phone TRIENERGIA GFCI Device Error If this error occurs frequently please contact your distributor or phone TRIENERGIA DCI Device Error If this error occurs frequently please contact your distributor or phone TRIEN...

Page 44: ...side of the solar panel check whether the inverter is in wet environment check whether the grounding of the inverter is loose or not If the above mentioned are in normal please contact your distributor or phone TRIENERGIA Current High Check the connection status between the inverter and the grid and test whether the volt of the grid is stable or not if the above mentioned are in normal please cont...

Page 45: ...sposal This device should not be disposed as residential waste For an Inverter that has reached the end of its life and is not required you must find an approved collection and recycling facility in your area Chapter 9 Guarantee Service Please refer to the warranty card ...

Page 46: ...us Series 45 Chapter 10 Contact TRIENERGIA Trienergia Web www trienergia it Email support trienergia it Tel 39 0376 598512 Coenergia S r l Strada Pavesa 13 46023 Bondeno di Gonzaga MN Italy Web www coenergia com Tel 39 0376 598512 ...

Page 47: ... years or 25 years but do not apply the extension beyond the specified date or else your application will be unacceptable Please refer to the Warranty Extension Order Form for more details Once the purchase of the warranty extension goes into effect Coenergia S r l will send the warranty extension certificate to the customer for confirming the extended warranty period Warranty Conditions If your i...

Page 48: ...r overhaul 2 Repaired on site by Coenergia S r l Service Center 3 Offer a replacement device of equivalent value according to model and age In case of replacement of the inverter Coenergia S r l will immediately send a replacement unit The faulty inverter must be duly prepared and stored in its original packaging and will be returned by Coenergia S r l In case the inverter needs to be replaced the...

Page 49: ...nce fee With parts replacement Labor Parts logistic fee to from Coenergia Labor On site attendance fee Parts On site attendance fee Cost of travel and time for the technician in attending on site Parts Cost of replacement parts including any shipping admin fee that may apply Labor Labor time fee charged for the technician who is repairing maintaining installing hardware or software and debugging t...

Page 50: ...afety regulations VDE standards etc The inverter has been improperly stored and damaged while being stored by the Dealer or the end user Transport damage including scratch caused by movement inside packaging during shipping A Claim should be made directly to shipping company insurance Company as soon as the container packaging is unloaded and such damage is identified Failure to follow any all of ...

Page 51: ...er informations Name and Surname or Company name Address ZIP Code Location and City Tel e Fax E mail Installer and PV System informations Company Name Address ZIP Code Location and City Tel e Fax E mail Type of device Serial Number S N Invoice Number and Date Commissioning Date PV Panels Type PV Panels for string Number of Strings Signature Date ...

Page 52: ...nergia SunUno Plus Series 51 Claim informations Type of device Serial Number S N Invoice Number and Date Commissioning Date Fault time Error message Display reading Short description of fault pictures Signature Date ...

Page 53: ...rter Trienergia SunUno Plus Series 52 Strada Pavesa 13 46023 Bondeno di Gonzaga MN Italy Web www coenergia com E mail support trienergia it Tel 39 0376 598512 Trienergia by Coenergia S r l Edition No V4 01 ...