
17 - 25
PE-70, PE-80 series parts list
No.
Item
Specification
Q’ty
Ø4
1
Compression bushing
Ø6
1
Ø4
2
Compression sleeve
Ø6
1
Ø4×1/8
3
Straight adaptor
Ø6×1/8
1
Ø4
4
Aluminum Pipe
(Reference only)
Ø6
1
(Fig. F)
Operation
(Fig. F)
a. Check the parts first.
b. Remove the compression bushing
and compression sleeve
out of the outlet
adaptor
.
c. Inset the end of the oil pipe into the compression bushing
and compression
sleeve
and connect with the outlet adaptor
d. The overhead of the pipe
after inserting the compression sleeve
needs
more than 1mm.
e. Align and tighten the pipe
with the compression bushing
to avoid the
leaking.
If the pipe
is loosen, remove the compression bushing
and compression
sleeve
then connect the pipe again.
3-4.4 Installation of power and alarm
Note !!
The installation of a fuse between the power supply and
Trico Corporation
centralized lubrication systems is strongly recommended !!
Operation
Note !!
Make sure the power cable is disconnected before the installation.
a.
Remove the e
lectrical control box cover
of the e
lectrical control box
connection box
(Fig. G).
b.
Loosen the cable gland (Fig. H).
c.
Insert the cable into the e
lectrical control box
through the cable gland hole (Fig. I).
(PE-70 series)
(PE-80 series)