background image

4

Important Notice:

To comply with regulations in force, your new boiler must be installed and commissioned

by an 

OFTEC

-registered engineer. The installation must also comply with current

Building Regulations, Part L.

Failure to meet the terms of these requirements may invalidate your guarantee.

THE PERSON(S) WHO INSTALLS THIS APPLIANCE, COMMISSIONS, SERVICES OR

CARRIES OUT ANY REMEDIAL WORK, IE ELECTRICAL FAULT FINDING, MUST

HAVE SUITABLE ENGINEERING QUALIFICATIONS

All servicing can be carried out from the front of the
boiler (50-90,000), thus allowing the boiler to be fitted
under a kitchen work top if required.  The front mounted
flue-cover permits easy access for the removal of the
flue-baffles and cleaning of heating surfaces.

The boiler is fully automatic in operation and incorporates
all necessary safety controls to ensure safe and reliable
operation.

Trianco EuroStar boilers are supplied with the burner set
for Kerosene C2 to BS 2869 fuel to meet the Building
Regulation requirements for low level flue discharge.  It is
recommended this fuel is also used when the boiler is
connected to a conventional chimney because of the
clean burning characteristics of Kerosene.

Balanced Flue Kits

The boilers are supplied suitably equipped for connection
to a conventional chimney, but can readily be converted
into a room-sealed balanced flue appliance by using a
Trianco balanced flue kit. These kits allow the boiler to be
installed in a wide variety of site conditions. (see bal-
anced flue kit details).

Note:
Only circular low level horizontal balanced flue kits
can be used on condensing boilers.

2. INTRODUCTION

Trianco boilers have been designed to conform to
European Directive/Standards BED 92/42 EEC LVD EN
60335-1 EMC 89/336/EEC.

The  boiler design incorporates a secondary stainless
steel heat exchanger, which recovers heat from the flue
gasses that would normally be lost when using
conventional oil fired boilers.

The matched pressure jet burner which is exceptionally
quiet in operation, ensures clean and efficient
combustion with low NOx emissions

As the EuroStar balanced flue boiler is a truly room
sealed appliance, it is also eminently suitable for
installation in a garage.

The EuroStar boilers are suitable for all normal open
vented central heating and indirect hot water systems
and can also be used with sealed systems up to a
working pressure of 3 bar with the appropriate sealed
system safety equipment.

Two flow and return sockets are provided to facilitate 
connection to the heating system.

To ensure the boiler is operating at its maximum efficiency,
the central heating return temperature should be 55°C or
less.

Maximum performance will be achieved by maintaining a
differential of 30°C between the flow and return temperatures.

Due to high efficiency of this range of boilers  when running
in condensing and non-condensing mode, it is essential
that only a fully pumped system be used.

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for EuroStar Premier 50/90 Condensing

Page 1: ...To be retained by householder USER INSTALLATION COMMISSIONING SERVICING INSTRUCTIONS OIL FIRED CENTRAL HEATING BOILERS FOR BALANCED OR CONVENTIONAL FLUE BED 92 42 EEC EMC 89 336 EEC Premier 50 90 Con...

Page 2: ...disposable gloves face masks and eye protection After handling wash hands and other exposed parts When disposing reduce dust with water spray ensure parts are securely wrapped GLUES SEALANTS PAINT Glu...

Page 3: ...ilation 8 9 Extractor fan 9 Electrical supply 9 Condensate Drain Connection 10 5 OIL SUPPLY Oil storage tank Steel and Plastic 11 Oil supply line 11 Single pipe oil supply 12 13 Two pipe oil supply 12...

Page 4: ...YOUR TRIANCO BOILER The Trianco EuroStar Condensing boiler has been designed and constructed to give years of trouble free service These instructions are provided to assist you in obtaining the best...

Page 5: ...nk is topped up at regular intervals do not wait until the tank is nearly empty before refilling otherwise sludge and water could be sucked into the oil pipe to affect the burner s operation and reduc...

Page 6: ...tallation and servicing instructions or The breakdown occurs immediately following an annual service visit In this instance your appointed Service Agent must check all his work PRIOR to requesting Tri...

Page 7: ...by using a Trianco balanced flue kit These kits allow the boiler to be installed in a wide variety of site conditions see bal anced flue kit details Note Only circular low level horizontal balanced fl...

Page 8: ...ENTRY BOTH SIDES RETURN CONNECTION DIA 22MM EACH SIDE FLOW CONNECTION DIA 22MM EACH SIDE Heating Return Cleaning Hole Heating Return Heating Flow Condensate drain Heating Flow Tee Elbow Condensate dra...

Page 9: ...5 12 5 Burner See Burner Details Weight empty kg 140 Water content litre 26 Flow return connections 22 mm compression Flue Socket Dia C F in 4 Max operating pressure bar 3 psi 43 5 Test Pressure bar...

Page 10: ...FIG 5 WIRING DIAGRAM 7...

Page 11: ...ales Part F Section 111 Scotland Part L The Control of Pollution Oil Regulations Current I E E Regulations Local Water Undertakings By laws OFTEC Installation Requirements for Oil Fired Boilers and Oi...

Page 12: ...h or low voltage fluctuations the oil burner shall be prevented from starting by the use of a voltage sensitive device if the voltage drops or increases sufficiently to endanger the installation Therm...

Page 13: ...visible position and where no damage can be caused to the appliance or surroundings if the trap was to overflow When installing the condensate trap it is important that the trap is filled with water t...

Page 14: ...re easier to handle because of their lower weight d They have a 10 year manufacturer s guarantee Plastic tanks should be fitted with similar components to those used with steel tanks Fire Protection T...

Page 15: ...bar other wise dissolved gas will be released from the oil to affect combustion 2 The return pipe must end at the same level as the suction outlet to prevent loss of prime 3 The outlet from the tank...

Page 16: ...ID 10 21 31 41 52 62 73 83 PIPE 8mm ID 33 66 98 100 100 100 100 100 MAXIMUM OIL SUPPLY LINE LENGTH L MAXIMUM LENGTH METRES LIFT H METRES 0 5 1 0 1 5 2 0 2 5 3 0 3 5 4 0 PIPE 6mm ID 48 42 36 30 24 18 1...

Page 17: ...14 FIG 13 DE AERATED OIL SUPPLY INSTALLATION REFER TO MANUFACTURERS INSTRUCTIONS FOR OIL DE AERATOR INSTALLATION DETAILS REMOTE OPERATED FIRE VALVE OIL FILTER...

Page 18: ...to run back in to the boiler No separate drain at the base of the flue system is required 3 Where an existing chimney is to be used it must be lined with a stainless steel liner that is approved for...

Page 19: ...seal Trianco boilers have a sealed air duct system which maintains the room sealed performance even when the casing door is removed for burner commissioning or adjustments The use of the balanced flu...

Page 20: ...aving the flue gasket in position 6 If the flue is to be fitted terminating to the left or right hand side of the boiler the corresponding section of side casing must be removed 7 To remove the sectio...

Page 21: ...SEALING PLATE 1 8 GASKET SUPPLIED WITH BOILER 9 FLUE PIPE O RING 1 10 JUBILEE CLIP 1 230mm ROUND KIT 2334 2335 Supplied with boiler Supplied with boiler IMPORTANT When installing the flue system it is...

Page 22: ...the flue system it is important that the flue assembly inclines slightly from the boiler This will allow any condensation formed in the flue to run back to the condense drain 2351 1000mm Horizontal Ro...

Page 23: ...temperature 9 If the system is not going to be put into immediate operation the fuel supply and electricity supply should be isolated If there is a possibility that the boiler will not be running duri...

Page 24: ...RE FITTING BAFFLES ENSURE THEY ARE RE FITTED AS SHOWN IN ARRANGEMENT SHOWN IE GAP ALTERNATING FROM FRONT TO BACK ON BOILER BAFFLES BOILER FLUE COVER PART NO 223053 1 OFF PART NO 223050 4 OFF PART NO...

Page 25: ...ell not seeing flame Clean photo cell and ensure it is fully plugged in Air trapped in pump Bleed off air through pressure gauge tapping Solenoid valve faulty Check coil for continuity and replace if...

Page 26: ...alve or air leak Replace non return valve and cure leak in two pipe system Low voltage Check with local Electricity Board Combustion readings incorrect Check combustion under normal running conditions...

Page 27: ...e W U Boiler See Fig 20 4 12 Flue Cover Assembly boiler 1 223019 13 Control Box Assembly 1 221944 14 Control Panel 3 223097 15 Front Door Assembly 1 223083 16 Burner Assembly 1 223120 17 Hose 1 209491...

Page 28: ...opyright in this brochure and the drawings or illustrations contained in it is vested in Trianco Limited and neither the brochure or any part thereof may be reproduced without prior written consent Tr...

Reviews: