Page 1: ...TRELLEBORG MARINE AND INFRASTRUCTURE Parallel Motion Fenders Handling Storage Installation and Maintenance Manual...

Page 2: ...ith customers to determine best fit solutions for specific applications and supply a fully integrated solution End to end service and a comprehensive product portfolio meet and exceed customer needs e...

Page 3: ...quality materials ensure a long low maintenance service life no matter how demanding the working and environmental conditions All fenders are supplied fully tested and meet PIANC 2002 guidelines Our...

Page 4: ...inite engineering analyses and calculations for both our fender systems and marine technology solutions DESIGN Our entire product range is manufactured in house meaning we have full control over the d...

Page 5: ...acturing process We ensure that life cycle and performance of our entire product range meets your specifications and more TESTING Local support on a truly global scale with customer support teams all...

Page 6: ...eously allows the panel to rotate on plan to accommodate large berthing angles Parallel Motion Fenders can absorb the full design energy irrespective of impact level As Parallel Motion Fenders are mos...

Page 7: ...rotation to accommodate berthing angles also eliminating moments in the hinge pin 5 UHMW PE face pads Trelleborg Double Sintered UHMW PE face pads are standard to minimize friction and maximize servic...

Page 8: ...TICE Reverse mounted twin cone fender PMF system installed on concrete structure Standard mounted twin cone fender PMF system installed on concrete structure Reverse mounted twin cone fender PMF syste...

Page 9: ...8 Parallel Motion Fender System PROVEN IN PRACTICE Reverse mounted single cone fender PMF system installed on concrete structure MV fender PMF system...

Page 10: ...9 The Parellel Motion Fenders PMF unit will be delivered completely plastic wrapped and protected with suitable paddings at the base and corners Handling...

Page 11: ...ck trailer so that the lifting points are exposed Lifting point locations and sizes are subject to change based on the project requirement Refer to the General Arrangement drawing for details A Spread...

Page 12: ...11 Storage At all times all equipment must be stored properly to avoid any damage environmental damage or damage occurring from nearby moving equipment...

Page 13: ...8 in 0 18 0 20 mm For long term storage 6 months use heavy duty tarp with an approximate thickness of 0 011 0 012 in 0 28 0 30 mm The tarpaulin must be tightly bound using nylon straps making sure tha...

Page 14: ...13 Installation...

Page 15: ...second fender on the Sandwich plate such that the bolt holes are aligned Insert and torque the bolts Recommendations After inserting the bolts only turn enough to ensure the threads are engaged and i...

Page 16: ...torque values should be used when fastening to steel Refer to MN I M RUB SCN SCK v1 0 EN 2017 for fender lifting methods Installing MV fenders Place the frontal frame face down to the ground supporte...

Page 17: ...ents Equipment Required Information Fasteners Supplied by Trelleborg Spanner Suitable to the supplied bolt size 2 2 1 Installation on concrete structure Unfasten ropes which connect the mounting brack...

Page 18: ...asten the fender with the supplied hardware shown in the general arrangement and anchor layout drawings Recommendations Use the standard bolt torque values when fastening to the steel Use torque value...

Page 19: ...te plant requirements Equipment Required Information Fasteners Supplied by Trelleborg While installing on steel pile Mounting of the hole locations and connecting plate sizes of the pile structure mus...

Page 20: ...19 Maintenance and Inspection...

Page 21: ...are still in place and are operating normally without excessive clearance External visual checks should be possible without stripping down the fender If the bearings have excessive play or are damaged...

Page 22: ...279 M56 2812 SCN 1600 264 M48 2281 SCN 1400 203 M42 1531 SCN 1300 177 M42 1338 SCN 1200 167 M42 1259 SCN 1100 128 M36 826 SCN 1050 143 M36 923 SCN 1000 131 M36 846 SCN 950 117 M30 632 SCN 900 107 M30...

Page 23: ...350 14 M16 39 SCN 300 11 M16 30 SCN FENDERS F0 7 TO F1 8 k 0 18 for hot dip galvanized screw threads with normal metric thread clean and dry ungreased k 0 15 for bolts with normal metric thread clean...

Page 24: ...Installation Inspection Maintenance Manual for Fender system MN I M RUB SCN SCK v1 0 EN 2017 Handling Storage Installation Inspection Maintenance Manual for SCN SCK Rubber Fender MN I M RUB MV UE v1 0...

Page 25: ...24...

Page 26: ...nd performance of our products and systems we reserve the right to make specification changes without prior notice All dimensions material properties and performance values quoted are subject to norma...

Page 27: ...26 For a smarter approach to your next project get in touch today Email marine_infra trelleborg com...

Page 28: ...omers in a sustainable way Trelleborg Marine and Infrastructure Email marine_infra trelleborg com www trelleborg com MARINEandinfrastructure facebook TrelleborgMarineandInfrastructure twitter Trellebo...