background image

8

Pre-Installation

Fusion SKI

 

bathtub

 

EN

PLATFORM

ok

ok

60

cm

cm

225

125

85 2,4 m

3

220 

120 

x

 66.5 

cm

(86.6 x 47.2 x 26.2 inch)

 maximum 

water 

content

 520 

litres

(137gal)

 weight 

with water

 670 

kg

(1477 lb)

 weight 

when empty

 150 

kg

(331 lb)

Volt

 230

Amperes

 16 

(230V)

jet pump 

motor

 1.8 

Hp

absorbed 

power

 1.35 

kW

recirculation

 

motor

 1.1 

Hp

absorbed 

power

 0.81 

kW

temperature  

control

 1300

Watt

operating 

pressure

-

 6

bar

operating 

temperature

 -5°C 

min

+45°C 

max

Size in cm

dimensional tolerances ± 5mm.

The manufacturer reserves the right to make improvements to the equipment at any time, without prior notice. 
Partial reproduction without the manufacturer's consent is prohibited. Measurements are purely indicative and not binding. 
The original language of this manual is Italian: the Manufacturer is not responsible for any mistakes in translation/interpretation.

1

FUSION SKI 

220

 - MEASUREMENTS AND TECHNICAL SPECIFICATIONS

The manufacturer suggests a 

minimum load of 425 kg/m

2

.

whirlpool pump motor position

Packaging

Freestanding

Recessed

Drain

120

82

19

220

182

19

45

10

66.5

90

26

60.5

26

7

7,5

Summary of Contents for Fusion SKI

Page 1: ...Fusion SKI bathtub Pre installation manual EN ...

Page 2: ... you to read this manual carefully and to carefully follow all the information contained herein The Treesse team is always available for any information or request for assistance that may be required during preparation GRUPPO TRE S s p a Telephone 39 0761 527242 Fax 39 0761 527223 Email info gruppotres it Good luck with your work ...

Page 3: ...PARATIONS ARE REQUIRED ________________________ 13 3 IDENTIFICATION OF THE INSTALLATION SITE___________________ 14 4 PREPARATION OF THE INSTALLATION SITE_____________________ 15 FREESTANDING INSTALLATIONS__________________________________________________________________15 RECESSED INSTALLATIONS_______________________________________________________________________16 5 PLUMBING PREPARATIONS________...

Page 4: ...2 6 bar operating temperature 5 C min 45 C max Size in cm dimensional tolerances 5mm The manufacturer reserves the right to make improvements to the equipment at any time without prior notice Partial reproduction without the manufacturer s consent is prohibited Measurements are purely indicative and not binding The original language of this manual is Italian the Manufacturer is not responsible for...

Page 5: ...y 1 0 2 0 2 0 9 5 3 0 ø40 AF AC B C C A Cold hot water connection 1 2 male AF cold water AC hot water B Floor drain ø40 C Electrical connection power cord type H05 with three wires single phase 230V 1 0 2 0 2 0 9 5 3 0 1 5 0 ø40 AF AC B 180 230 1 0 2 0 2 0 8 0 3 0 ø40 AF AC B display C C ...

Page 6: ...sure 2 6 bar operating temperature 5 C min 45 C max Size in cm dimensional tolerances 5mm The manufacturer reserves the right to make improvements to the equipment at any time without prior notice Partial reproduction without the manufacturer s consent is prohibited Measurements are purely indicative and not binding The original language of this manual is Italian the Manufacturer is not responsibl...

Page 7: ...2 0 9 5 3 0 ø40 AF AC B C C A Cold hot water connection 1 2 male AF cold water AC hot water B Floor drain ø40 C Electrical connection power cord type H05 with three wires single phase 230V 1 0 2 0 2 0 9 5 3 0 1 0 2 0 2 0 8 0 3 0 ø40 AF AC B display 1 0 2 0 2 0 9 5 3 0 ø40 AF AC B 150 230 C C ...

Page 8: ... 45 C max Size in cm dimensional tolerances 5mm The manufacturer reserves the right to make improvements to the equipment at any time without prior notice Partial reproduction without the manufacturer s consent is prohibited Measurements are purely indicative and not binding The original language of this manual is Italian the Manufacturer is not responsible for any mistakes in translation interpre...

Page 9: ...connection power cord type H05 with three wires single phase 230V 120 220 220 120 180 230 230 180 1 5 0 3 0 9 5 2 0 2 0 1 0 ø40 AF AC B 9 0 3 0 9 0 2 0 2 0 1 0 ø40 AF AC B 1 0 2 0 2 0 9 5 ø40 AF AC B 3 0 1 5 0 1 0 2 0 2 0 9 0 ø40 AF AC B 3 0 9 0 C C C C 1 0 2 0 2 0 9 0 ø40 AF AC B 3 0 9 0 C Standard left version Right version on request ...

Page 10: ... operating pressure 2 6 bar operating temperature 5 C min 45 C max Size in cm dimensional tolerances 5mm The manufacturer reserves the right to make improvements to the equipment at any time without prior notice Partial reproduction without the manufacturer s consent is prohibited Measurements are purely indicative and not binding The original language of this manual is Italian the Manufacturer is...

Page 11: ...ø40 AF AC B 1 0 2 0 2 0 9 5 ø40 AF AC B 3 0 1 5 0 1 0 2 0 2 0 9 0 ø40 AF AC B 3 0 9 0 C C C C Standard left version Right version on request 1 0 2 0 2 0 9 5 3 0 1 5 0 ø40 AF AC B 1 8 0 2 3 0 C A Cold hot water connection 1 2 male AF cold water AC hot water B Floor drain ø40 C Electrical connection power cord type H05 with three wires single phase 230V ...

Page 12: ...a proper preparation of the environments and the plumbing and electrical connections This allows for a quick and safe installation The pre installation stages involve the following professionals A construction engineer for the calculation of the loading capacity of the platforms or floors A qualified and certified company that will prepare the installation site according to the instructions provid...

Page 13: ...er supply Water supply Technical inspection port 2 WHAT PREPARATIONS ARE REQUIRED To be installed the bathtub requires 1 Identification of the installation site 2 Preparation of the installation site 3 Preparation of the plumbing 4 Preparation of the electrical system The following pages will provide detailed explanations of how to perform these preparations EXAMPLES OF BATHTUB INSTALLA TION ...

Page 14: ...N Note that the evaporation of water in the bathtub in the presence of high internal temperatures can generate very high levels of humidity in the environment To overcome this drawback choose an environment with good natural or forced ventilation As an alternative install a dehumidification system Humidity damage is not covered by the manufacturer warranty Take into account the size of the bathtub...

Page 15: ...e Wedges or shims cannot be placed under the bathtub to level it only the feet of the bathtub can be ad justed Remember to ground the structural reinforcement in accordance with electrical codes For the preparation of the water and electrical connections see the pertinent section on page 18 and 20 Flooring it is recommended to choose a flooring that minimises the possibility of slipping when getti...

Page 16: ...ection port at least 50 cm wide on all sides of the bathtub This will make future maintenance or repairs easier B Drainage grating around the perimeter and in the recess to help preserve the equipment and the structure even for indoor installations C Flooring it is recommended to choose a flooring that minimises the possibility of slipping when getting in and out of the bathtub D Two Ø15 cm vents ...

Page 17: ...00 56 measurements in cm measurements in cm See the plumbing and electrical preparations on page 18 and 20 A Technical compartment for maintenance of operational components plan for 50 cm on all sides of the bathtub B Internal drainage grates D 2 Ø15 cm vents to ensure proper ventilation of the technical compartment C Flooring it is recommended to choose a flooring that minimises the possibility o...

Page 18: ... It is important that the water used be drinkable It is always advisable not to use well water because it may be very hard rich in metals like iron and manganese and have bacterial loads Tap water is recommended In the case of very hard or ferrous water it is always recommended to install softening and iron removal systems upstream The company cannot be held responsible for issues related to the u...

Page 19: ...nection to the bathtub using the 1 2 inch female hoses provided Connect the drain of the floor bathtub The plumber is responsible for the choice and type of materials to be used and the verification of compliance with anti pollution standards The images are purely indicative the model and type must be chosen by the plumber based on the characteristics of the water and the current system EXAMPLE OF...

Page 20: ...PARATIONS Controlled by a multi pole switch with a contact gap of at least 3 mm and a breaking capacity equal to 60A or in any case adequate for the absorption of the bathtub Controlled by a differential switch no larger than 30mA The control unit s power supply cable must be of the H05 type with three wires single phase 220V whose gauges are adequate for the absorption of the bathtub see pre inst...

Page 21: ... CABLE CN8 CAVO LIV H2O CN8 H2O LEVEL CABLE CAVO A CABLEA CN19 CAVO A J5 1 GIALLO 2 VERDE DOCCINO J6 1 BIANCO 2 MARRONE EV DISINFEZIONE J7 1 GRIGIO 2 ROSA EV CARICO CABLE A J5 1 YELLOW 2 GREEN FLEXIBLE SHOWER J6 1 WHITE 2 BROWN DISINFECTION EV J7 1 GREY 2 PINK CHARGE EV J9 1 ROSSO 2 BLU EV SCARICO J11 1 NERO 2 VIOLA EV SCARICO J9 1 RED 2 BLUE DISCHARGE EV J11 1 BLACK 2 PURPLE DISCHARGE EV CN3 1 BI...

Page 22: ...Notes Notes ...

Page 23: ...be small differences between this manual and the product you have received we apologise in advance for any inconvenience The total or partial reproduction of this manual without the Manufacturer s consent is prohibited Measurements are purely indicative and not binding The original language of this manual is Italian the Manufacturer is not responsible for any mistakes in translation interpretation...

Page 24: ...ion SKI pre installation Edition 12 2017 www gruppotreesse it GRUPPO TRE S s p a 01036 Nepi VT Italy S S Cassia km 36 400 Settevene industrial area tel 39 0761 527242 fax 39 0761 527223 info gruppotres it ...

Reviews: