Pre-Installation
Fusion SKI
bathtub
EN
E
Insulation
E
Insulation
56
See the plumbing
and electrical
preparations on
page 18 and 20.
A
Technical compartment for
maintenance of operational
components: plan for 50 cm
on all sides of the bathtub
B
Internal drainage
grates
D
2 Ø15 cm vents to ensure
proper ventilation of the
technical compartment
C
Flooring (it is recommended to choose a flooring
that minimises the possibility of slipping when
getting in and out of the bathtub)
FUSION SKI
200
56
(measur
ements in cm)
(measur
ements in cm)
See the plumbing
and electrical
preparations on
page 18 and 20.
A
Technical compartment for
maintenance of operational
components: plan for 50 cm on all
sides of the bathtub
B
Internal drainage
grates
D
2 Ø15 cm vents to ensure
proper ventilation of the
technical compartment
C
Flooring (it is recommended to choose a
flooring that minimises the possibility of
slipping when getting in and out of the
bathtub)
Concrete slab with a thickness
suitable for supporting the
weight of the bathtub + the
weight of the people within
FUSION SKI
231
Concrete slab with a thickness suitable for
supporting the weight of the b the
weight of the people within