Energy Type
Pressurized Water
Hazard:
Flooding leading to possible other hazards
Magnitude:
103-414kPa (15-60PSIG)
Control Method:
Fluid Valve
Shutdown Procedure
Switch off circuit breaker disconnect on front of system or turn off
incoming air supply from facility
2.5.b Machine Shutdown with door closed
Perform the following sequence of events in the order listed for electrical
energy isolation of the tool:
1.
Notify personnel in the area that you are going to shut down the
equipment.
2.
Shutdown the system in an orderly fashion.
3.
Locate the main circuit breaker disconnect switch.
4.
Move the actuating handle to the "OFF" position.
5.
Apply the locking energy isolation device (lock) through the hole in the
actuating handle and secure the lock.
6.
Verify that the tool has been isolated and de-energized by attempting
to turn the main power disconnect back to the “ON” position and/or by
pressing the machine start button. The machine power must not be
reapplied and/or the machine must not start.
2.5.c Machine Start-Up with door closed
Perform the following sequence of events in the order listed for electrical
re-energization of the tool:
1.
Ensure that all hand tools are removed from the equipment and that it
is ready for start-up.
2.
Notify personnel in the area that you are going to start-up the
equipment.
3.
Open the lock and remove the locking energy isolation device (lock)
from the hole in the actuating handle of the main circuit breaker
disconnect switch.
4.
Move the actuating handle to the "ON" (up) position.
5.
Press the machine “Reset” button. The machine should start.