31
•
Turn the adjustment nut to either increase or decrease the amount of threaded bolt
protruding from the spring block. The more bolt that is protruding, the more compressed
the spring will be, resulting in higher load on the rollers.
•
Test the machine to verify adequate roller pressure. Once roller pressure is determined
to be sufficient, tighten the jam nut against the spring block, locking the adjustment in
place.
Figure 20: Parts of the Spring Tension Adjustment
Drive Belt adjustment
•
Disconnect the machine from power.
•
Remove the two screws securing pulley guard, and remove the pulley guard. Inspect
the inside of the guard for signs of contact with the pulleys.
•
Loosen the four bolts securing motor. Do not remove the bolts, simply loosen them to
allow the motor to move freely back and forth in its milled slots.
Adjustment
nut
Locking Jam
Nut
Summary of Contents for 1000 4.5 Hot cutter
Page 1: ...Service Manual for 1000 Series Strip cutters Rev 1 1 6 6 22 ...
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 66: ...Drive Transistor Test ...