Installation
(for qualified installers only)
11
© Travis Industries
4140922
100-01410
Minimum Framing Dimensions – Top Vent
NOTE
: When the vent is routed vertically the framing must accommodate the vent and required 1”
clearance. The framing dimensions below reflect the additional 1” depth required.
(a
) Minimum Enclosure Height
41.25"
1048mm
48"
1219mm
22.75"
(578mm)
56.375"
1432mm
a