Rev.A0
1-May-11
17
•
TP Port and Cable Installation
In the switch, TP port supports MDI/MDI-X auto-crossover, so both types of
cable, straight-through (Cable pin-outs for RJ-45 jack 1, 2, 3, 6 to 1, 2, 3, 6 in
10/100M TP; 1, 2, 3, 4, 5, 6, 7, 8 to 1, 2, 3, 4, 5, 6, 7, 8 in Gigabit TP) and
crossed-over (Cable pin-outs for RJ-45 jack 1, 2, 3, 6 to 3, 6, 1, 2) can be used.
It means you do not have to tell from them, just plug it.
Use Cat. 5 grade RJ-45 TP cable to connect to a TP port of the switch and the
other end is connected to a network-aware device such as a workstation or a
server.
Repeat the above steps, as needed, for each RJ-45 port to be connected to a
Gigabit 10/100/1000 TP device.
Now, you can start having the switch in operation.
•
Power On
The switch supports 100-240 VAC, 50-60 Hz power supply. The power
supply will automatically convert the local AC power source to DC power. It does not
matter whether any connection plugged into the switch or not when power on, even
modules as well. After the power is on, all LED indicators will light up immediately
and then all off except the power LED still keeps on. This represents a reset of the
system.
•
Firmware Loading
After resetting, the bootloader will load the firmware into the memory. It will
take about 30 seconds, after that, the switch will flash all the LED once and
automatically performs self-test and is in ready state.
Summary of Contents for SM8T2DPA
Page 2: ......
Page 7: ...Rev A0 1 May 11 v Revision History Date Revision 05 01 2010 A0...
Page 90: ...Rev A0 1 Mar 11 88 Fig 3 36 Fig 3 37 Fig 3 38...
Page 91: ...Rev A0 1 May 11 89 Fig 3 39 Fig 3 40 Fig 3 41 Fig 3 42...
Page 104: ...Rev A0 1 Mar 11 102 Fig 3 61 Set up VLAN Tag Priority Mapping...
Page 105: ...Rev A0 1 May 11 103 Fig 3 62 Set up VLAN Tag Priority Mapping Finish...
Page 113: ...Rev A0 1 May 11 111 Fig 3 69 Frame Type Fig 3 70...
Page 114: ...Rev A0 1 Mar 11 112 Fig 3 71 Fig 3 72 Fig 3 73 ARP...
Page 115: ...Rev A0 1 May 11 113 Fig 3 74 ARP Fig 3 75 ARP Fig 3 76 ARP Fig 3 77 ARP...
Page 116: ...Rev A0 1 Mar 11 114 Fig 3 79 ARP Fig 3 80 ARP Fig 3 81 ARP...
Page 117: ...Rev A0 1 May 11 115 Fig 3 82 ARP Fig 3 83 ARP Fig 3 84 ARP Fig 3 85 ARP Fig 3 86 ARP...
Page 118: ...Rev A0 1 Mar 11 116 Fig 3 87 ARP Fig 3 88 IPv4...
Page 119: ...Rev A0 1 May 11 117 Fig 3 89 IPv4 Fig 3 90 IPv4 Fig 3 91 IPv4 Fig 3 92 IPv4 Fig 3 93 IPv4...
Page 120: ...Rev A0 1 Mar 11 118 Fig 3 94 IPv4 Fig 3 95 IPv4 Fig 3 96 IPv4 Fig 3 97 IPv4 Fig 3 98 IPv4...
Page 121: ...Rev A0 1 May 11 119 Fig 3 99 IPv4 Fig 3 100 IPv4 Fig 3 101 IPv4 Fig 3 102 IPv4...
Page 122: ...Rev A0 1 Mar 11 120 Fig 3 103 IPv4 Fig 3 104 IPv4 Fig 3 105 IPv4...
Page 123: ...Rev A0 1 May 11 121 Fig 3 106 IPv4 Fig 3 107 IPv4 Fig 3 108 IPv4...
Page 124: ...Rev A0 1 Mar 11 122 Fig 3 109 IPv4 Fig 3 110 IPv4 Fig 3 111 IPv4...
Page 125: ...Rev A0 1 May 11 123 Fig 3 112 IPv4 Fig 3 113 IPv4 Fig 3 114 IPv4...
Page 126: ...Rev A0 1 Mar 11 124 Fig 3 115 IPv4 Fig 3 116 IPv4 Fig 3 117 IPv4...
Page 127: ...Rev A0 1 May 11 125 Fig 3 118 Action Fig 3 119 Rate Limiter...
Page 128: ...Rev A0 1 Mar 11 126 Fig 3 120 Port Copy Fig 3 121 DMAC Filter...
Page 129: ...Rev A0 1 May 11 127 Fig 3 122 VLAN ID Filter Fig 3 123 VLAN ID Filter Fig 3 124 Tag Priority...
Page 218: ...Rev A0 1 Mar 11 216 Fig 4 1...
Page 321: ...10900 Red Circle Drive Minnetonka MN 55344 Tel 1 952 941 7600 techsupport transition com...