Transition Networks SISTF101X-241-LRT
24-Hour Technical Support: 1-800-260-1312 International: 00-1-952-941-7600
20
Installation Steps
1. Unpack the Industrial switch packing.
2. Check the DIN-Rail is screwed on the Industrial switch. If the DIN-Rail is not screwed on
the Industrial switch. Please refer to
DIN-Rail Mounting
section for DIN-Rail installation.
If you want to wall mount the Industrial switch, then please refer to
Wall Mount Plate
Mounting
section for wall mount plate installation.
3. To hang the Industrial switch on the DIN-Rail track or wall, please refer to the
Mounting
Installation
section.
4. Power on the Industrial switch. How to wire the power; please refer to the
Wiring the
Power Inputs
section. The power LED on the Industrial switch will light up. Please refer
to the
LED Indicators
section for meaning of LED lights.
5. Prepare the twisted-pair, straight through Category 5 cable for Ethernet connection.
6. Insert one side of Category 5 cables into the Industrial switch Ethernet port (RJ-45 port)
and another side of category 5 cables to the network devices’ Ethernet port (RJ-45 port),
ex: switch, PC or Server. The UTP port (RJ-45) LED on the Industrial switch will light up
when the cable connected with the network device. Please refer to the
LED Indicators
section for LED light meaning.
7. When all connections are all set and LED lights all show in normal, the installation is
complete.