Transforming Technologies BFN 802 Instruction Manual Download Page 11

 

 

Periodic Verification: 

  

BFN ionizer have no user serviceable parts and the technology 
requires no calibration because of the inherently stable ioniza-
tion output from the AC emission. Periodic verification is rec-
ommended, per ANSI/ESD SP3.3-2006 Periodic Verification of 
Air Ionizers. Verification frequency may be set by the individ-
ual user, but is recommended to be not less than one time 
per year. 

E. Replace light cover and slide to the right to lock in place. 

C

Summary of Contents for BFN 802

Page 1: ...T R A N S F O R M I N G T E C H N O L O G I E S L L C O U T S T A N D I N G A L T E R N A T I V E S I N S T A T I C C O N T R O L Static Eliminators BFN 802 Ionizing Blower Instruction Manual BFN...

Page 2: ...FN 802 BFN Series 1 Description 2 Features 2 Specification 3 Operating Guide 4 Dis Assembly 6 Bulb Replacement 8 Periodic Verification 9 2 About Service warranty 10 Transforming Technologies 10 Conten...

Page 3: ...AC ionizing blowers are designed for safe operation under normal use Safety switches under the front and rear removable finger guards shut off the unit protecting the operator during maintenance Do no...

Page 4: ...ped with task lighting integrated emitter cleaners and safe easy maintenance access BFN series AC ionizers from Transforming Technologies create a dense and well balanced ionization current They are u...

Page 5: ...ea coverage Balance 0 10 volts Decay Time 3 seconds 18 directly under center of unit 1000V 100V fan speed on high Temperature 32 122 F 0 50 C RH Operating Range 20 60 non condensing Ozone Production 0...

Page 6: ...and connect the power cord Rotate the on off fan speed knob clockwise to turn on the unit Continue rotat ing the knob to achieve the desired fan speed Note Do not insert any object into the air inlet...

Page 7: ...nt is on the bottom right of fan guard Do Not Force Internal fan cleaning All BFN series ionizing blowers offer convenient cleaning of the internal fan assembly Use the following procedure to maintain...

Page 8: ...Cleaning Cont After removing both front and rear fan guards the emitter points and fan assembly will be unob structed for easy deep cleaning Use a soft brush Isopropyl Alcohol and compressed air to re...

Page 9: ...attached C Press the sides of the cover in to make sure cover is securely attached A B C Air Inlet Assembly A Line up the clips on the rear fan guard with the slots on the BFN fan housing B Push the...

Page 10: ...ask lights to eliminate the work station and improve worker efficiency The unit comes with two 5W bulbs already installed Bulb Replacement Procedure Note Always disconnect the ionizer from the power s...

Page 11: ...ly stable ioniza tion output from the AC emission Periodic verification is rec ommended per ANSI ESD SP3 3 2006 Periodic Verification of Air Ionizers Verification frequency may be set by the individ u...

Page 12: ...collateral or conse quential damages To receive service under warranty please contact Transforming Technologies Technical Sup port About Transforming Technologies Since 1998 Transforming Technologies...

Reviews: