9
Rigging and placement
Please use the forklift with proper capacity tonnage to transport and handle, for weight of each
model please refer to reference table 1.
Table 1.
Please install the water chiller at a place with well drainage facilities to facilitate massive drainage
during shutdown or repair.
Please use the forklift with proper capacity tonnage to move this water chiller to its installation
position. During lifting work, please use canvas sling, which shall be wrapped across the water
chiller pedestal and tied tightly, as shown in Figure 1.
Installation
Model
The maximum net weight (kg)
≈
0305R
130
0306R
131
0505R
141
0605R
149
0606R
320
0755R
202
1005R
449
1205R
530
1505R
530
2005R
540
Protection
Cliver
Protection
Tape
Tape
sling
sling
Protection
Protection
Base
Figure 1. Rigging