background image

4

 PART-SVN85C-EN

Kit Contents

There are two knobs for the PTED and PTHD power board included with the KIT09667. This kit also 
ships with the replacement Power Board.

Knob Installation

When replacing a control panel knob or the power board on a PTAC remove both knobs currently 
on the control panel and replace both with the two knobs contained in KIT09667. This knob kit also 
ships with the power board.

NOTICE

Mechanical Damage!

Failure to replace both of the knobs with the new parts or improper installation procedures may 
result in the power board being damaged. When not properly installed the knobs could turn past 
their stop points and mechanically damage the power board.

Figure 1.

Install knobs first

Figure 2.

Escutcheon cover goes over knobs, not under

Note:

Always install the knob first, followed by the escutcheon.

Reviews: