![Trane GXAA Installation, Operation And Maintenance Manual Download Page 36](http://html1.mh-extra.com/html/trane/gxaa/gxaa_installation-operation-and-maintenance-manual_1149991036.webp)
36
MUA-SVX006B-EN
3. Place the system switch in the ON position.
N
No
otte
e:: With the thermostat calling for cooling, unit operation is automatic.
F
Fiin
na
all C
Ch
he
ecckko
ou
utt
Run the unit sequentially through its stages of heating and cooling. Once proper unit operation is
verified, perform these final steps:
1. Inspect unit for debris and/or misplaced tools and hardware.
2. Be sure all gas valves and controls are in the operating position if the unit will be operating
immediately.
3. Cycle unit on all safety controls to verify proper unit operation.
4. Confirm proper operating control (thermostat or ductstat) operation by cycling unit.
5. Secure all exterior panels in place.
Summary of Contents for GXAA
Page 16: ...16 MUA SVX006B EN Figure 7 Flexible Connector Kit Install I In ns st ta al ll la at ti io on n...
Page 17: ...MUA SVX006B EN 17 Figure 8 Flexible Connector Kit Install I In ns st ta al ll la at ti io on n...
Page 18: ...18 MUA SVX006B EN Figure 9 Flexible Connector Kit Install I In ns st ta al ll la at ti io on n...
Page 48: ...48 MUA SVX006B EN Dimensional Data Arrangements Indoor Arrangement A Capacity 50 80...
Page 55: ...MUA SVX006B EN 55 Motor Electric Data Table 4 Full Load Current in Amperes...
Page 58: ...58 MUA SVX006B EN Coil Cabinet Dimensional Data Figure 25 Coil Cabinet Dimensional Data...
Page 62: ...62 MUA SVX006B EN Gas Equipment Start Up...