
MUA-SVX006B-EN
11
•
On units with a total length of a 104" (2642mm) or greater, excluding evaporative cooler,
lifting lugs/brackets attached to the base rail are provided. Once the unit is set in place these
lifting brackets may be removed if required.
•
Attach rigging to lugs/brackets for lifting the unit. For distance between lifting lugs/brackets
and total unit lengths, refer to the
Dimensional Data
section of this manual.
Figure 1. Hoisting of Make-Up Air Unit (Single Furnace) Without Lifting Brackets
Figure 2. Hoisting of Make-Up Air Unit (Single Furnace) With Lifting Brackets
Summary of Contents for GXAA
Page 16: ...16 MUA SVX006B EN Figure 7 Flexible Connector Kit Install I In ns st ta al ll la at ti io on n...
Page 17: ...MUA SVX006B EN 17 Figure 8 Flexible Connector Kit Install I In ns st ta al ll la at ti io on n...
Page 18: ...18 MUA SVX006B EN Figure 9 Flexible Connector Kit Install I In ns st ta al ll la at ti io on n...
Page 48: ...48 MUA SVX006B EN Dimensional Data Arrangements Indoor Arrangement A Capacity 50 80...
Page 55: ...MUA SVX006B EN 55 Motor Electric Data Table 4 Full Load Current in Amperes...
Page 58: ...58 MUA SVX006B EN Coil Cabinet Dimensional Data Figure 25 Coil Cabinet Dimensional Data...
Page 62: ...62 MUA SVX006B EN Gas Equipment Start Up...