22
RT-SVX069A-EN
disconnect switch. This assembly is located in the
condenser section of the unit.
Both high and low voltage power can be routed
through the base or through the front corner post
where the disconnect enclosure is mounted. The
hole is sized for 1 1/2–in. conduit.
2. If the conduit required for your application is larger
than 1 1/2–in., remove the termination plate and
connect to the larger hole using field supplied
reducing washers.
3.
Route the power wires and ground conductor
through conduit and into the bottom of a field-
installed disconnect switch. Connect the power
conductors to the lugs provided. Connect the
ground wire to the unit ground lug.
N
No
otte
e:: Wire size for the length of run should be
determined using the circuit ampacity found
on the unit nameplate and the N.E.C.
4. Route low voltage (class II), control wiring through
hole in base of unit but not through high voltage
conduit. Feed control wiring through bushing
provided on side panel. Route wires through loose
wire ties provided.
5. Tighten the wire ties. Secure the excess wire bundle
under the wire ties in the outdoor section. Do not
leave excess wire in the electrical enclosure. Use
the unit wiring diagram to make the low voltage
connections.
Figure 15.
Field wiring route
Through the Base Gas Utility
Option
This section contains the instructions for making field
connections to the Through the Base Gas Utility
Option.
Field Installed Connections
W
WA
AR
RN
NIIN
NG
G
H
Ha
azza
arrd
do
ou
uss V
Vo
olltta
ag
ge
e w
w//C
Ca
ap
pa
acciitto
orrss!!
F
Fa
aiillu
urre
e tto
o d
diisscco
on
nn
ne
ecctt p
po
ow
we
err a
an
nd
d d
diisscch
ha
arrg
ge
e
cca
ap
pa
acciitto
orrss b
be
effo
orre
e sse
errv
viicciin
ng
g cco
ou
ulld
d rre
essu
ulltt iin
n d
de
ea
atth
h o
orr
sse
erriio
ou
uss iin
njju
urry
y..
D
Diisscco
on
nn
ne
ecctt a
allll e
elle
eccttrriicc p
po
ow
we
err,, iin
nccllu
ud
diin
ng
g rre
em
mo
otte
e
d
diisscco
on
nn
ne
eccttss a
an
nd
d d
diisscch
ha
arrg
ge
e a
allll m
mo
otto
orr sstta
arrtt//rru
un
n
cca
ap
pa
acciitto
orrss b
be
effo
orre
e sse
errv
viicciin
ng
g.. F
Fo
ollllo
ow
w p
prro
op
pe
err
llo
occkko
ou
utt// tta
ag
go
ou
utt p
prro
occe
ed
du
urre
ess tto
o e
en
nssu
urre
e tth
he
e p
po
ow
we
err
cca
an
nn
no
ott b
be
e iin
na
ad
dv
ve
errtte
en
nttlly
y e
en
ne
errg
giizze
ed
d.. V
Ve
erriiffy
y w
wiitth
h a
a
C
CA
AT
T IIIIII o
orr IIV
V v
vo
ollttm
me
ette
err rra
atte
ed
d p
pe
err N
NF
FP
PA
A 7
70
0E
E tth
ha
att a
allll
cca
ap
pa
acciitto
orrss h
ha
av
ve
e d
diisscch
ha
arrg
ge
ed
d..
F
Fo
orr a
ad
dd
diittiio
on
na
all iin
nffo
orrm
ma
attiio
on
n rre
eg
ga
arrd
diin
ng
g tth
he
e ssa
affe
e
d
diisscch
ha
arrg
ge
e o
off cca
ap
pa
acciitto
orrss,, sse
ee
e P
PR
RO
OD
D--S
SV
VB
B0
06
6*
*--E
EN
N..
W
WA
AR
RN
NIIN
NG
G
P
Prro
op
pe
err F
Fiie
elld
d W
Wiirriin
ng
g a
an
nd
d G
Grro
ou
un
nd
diin
ng
g
R
Re
eq
qu
uiirre
ed
d!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w cco
od
de
e cco
ou
ulld
d rre
essu
ulltt iin
n d
de
ea
atth
h o
orr
sse
erriio
ou
uss iin
njju
urry
y..
A
Allll ffiie
elld
d w
wiirriin
ng
g M
MU
US
ST
T b
be
e p
pe
errffo
orrm
me
ed
d b
by
y q
qu
ua
alliiffiie
ed
d
p
pe
errsso
on
nn
ne
ell.. IIm
mp
prro
op
pe
errlly
y iin
nsstta
alllle
ed
d a
an
nd
d g
grro
ou
un
nd
de
ed
d
ffiie
elld
d w
wiirriin
ng
g p
po
osse
ess F
FIIR
RE
E a
an
nd
d E
EL
LE
EC
CT
TR
RO
OC
CU
UT
TIIO
ON
N
h
ha
azza
arrd
dss.. T
To
o a
av
vo
oiid
d tth
he
esse
e h
ha
azza
arrd
dss,, y
yo
ou
u M
MU
US
ST
T ffo
ollllo
ow
w
rre
eq
qu
uiirre
em
me
en
nttss ffo
orr ffiie
elld
d w
wiirriin
ng
g iin
nsstta
alllla
attiio
on
n a
an
nd
d
g
grro
ou
un
nd
diin
ng
g a
ass d
de
essccrriib
be
ed
d iin
n N
NE
EC
C a
an
nd
d y
yo
ou
urr llo
occa
all//
sstta
atte
e//n
na
attiio
on
na
all e
elle
eccttrriicca
all cco
od
de
ess..
IIm
mp
po
orrtta
an
ntt:: All phases of this installation must comply
with NATIONAL, STATE, and LOCAL
CODES. In absence of local codes, the
installation must conform with American
National Standard-Z223.1a- National Fuel
Gas Code Latest Revision.
1. Field connections are made by first removing the
access panel for the heat section on the front of the
unit.
2. The gas piping assembly ships inside this section
and includes the shut-off valve, a pressure tap for
testing, and the necessary unions for field
connection. For through the base access, remove
the factory-provided cap from the base pan
opening. See
.
3. Route field piping through this hole to the
dimension shown in
.
4. Place the assembly through the cabinet opening as
shown in
and make the union
connection to the field piping and to the gas train.
Refer to the
“Heating Operation (for Gas Units) -
for startup
instructions.