RT-SVX069A-EN
15
Installation
Unit Foundation
W
WA
AR
RN
NIIN
NG
G
R
Riisskk o
off R
Ro
oo
off C
Co
olllla
ap
pssiin
ng
g!!
F
Fa
aiillu
urre
e tto
o e
en
nssu
urre
e p
prro
op
pe
err ssttrru
uccttu
urra
all rro
oo
off ssu
up
pp
po
orrtt
cco
ou
ulld
d cca
au
usse
e tth
he
e rro
oo
off tto
o cco
olllla
ap
psse
e,, w
wh
hiicch
h cco
ou
ulld
d
rre
essu
ulltt iin
n d
de
ea
atth
h o
orr sse
erriio
ou
uss iin
njju
urry
y a
an
nd
d p
prro
op
pe
errtty
y
d
da
am
ma
ag
ge
e..
C
Co
on
nffiirrm
m w
wiitth
h a
a ssttrru
uccttu
urra
all e
en
ng
giin
ne
ee
err tth
ha
att tth
he
e rro
oo
off
ssttrru
uccttu
urre
e iiss ssttrro
on
ng
g e
en
no
ou
ug
gh
h tto
o ssu
up
pp
po
orrtt tth
he
e
cco
om
mb
biin
ne
ed
d w
we
eiig
gh
htt o
off tth
he
e rro
oo
offccu
urrb
b,, tth
he
e u
un
niitt,, a
an
nd
d a
an
ny
y
a
acccce
esssso
orriie
ess..
N
NO
OT
TIIC
CE
E
W
Wa
atte
err D
Da
am
ma
ag
ge
e!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss b
be
ello
ow
w cco
ou
ulld
d rre
essu
ulltt iin
n
e
eq
qu
uiip
pm
me
en
ntt a
an
nd
d p
prro
op
pe
errtty
y d
da
am
ma
ag
ge
e..
N
No
on
n--ffa
acctto
orry
y p
pe
en
ne
ettrra
attiio
on
nss tth
hrro
ou
ug
gh
h tth
he
e b
ba
asse
e o
off tth
hiiss
u
un
niitt a
arre
e n
no
ott a
allllo
ow
we
ed
d.. A
An
ny
y p
pe
en
ne
ettrra
attiio
on
n iin
n tth
he
e b
ba
asse
e
o
off tth
he
e u
un
niitt m
ma
ay
y a
affffe
ecctt tth
he
e w
wa
atte
err ttiig
gh
htt iin
ntte
eg
grriitty
y o
off
tth
he
e u
un
niitt a
an
nd
d lle
ea
ad
d tto
o w
wa
atte
err lle
ea
akkss iin
ntto
o tth
he
e
cco
on
nd
diittiio
on
ne
ed
d ssp
pa
acce
e..
Horizontal Units
N
NO
OT
TIIC
CE
E
P
Po
otte
en
nttiia
all O
Ov
ve
errh
he
ea
attiin
ng
g C
Co
on
nd
diittiio
on
n!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss cco
ou
ulld
d rre
essu
ulltt iin
n
e
eq
qu
uiip
pm
me
en
ntt d
da
am
ma
ag
ge
e..
D
Do
o n
no
ott cco
on
nv
ve
errtt h
hiig
gh
h h
he
ea
att u
un
niittss tto
o h
ho
orriizzo
on
ntta
all
a
aiirrffllo
ow
w cco
on
nffiig
gu
urra
attiio
on
n.. T
Th
he
esse
e m
mo
od
de
ellss a
arre
e d
de
essiig
gn
ne
ed
d
ffo
orr d
do
ow
wn
nffllo
ow
w a
ap
pp
plliicca
attiio
on
nss o
on
nlly
y..
N
No
otte
ess::
•
For units with optional Condensate
Overflow Switch (COF) accessory kit, the
switch will not work properly if unit is not
level or slightly sloped toward switch.
•
To assure proper condensate flow during
operation the unit and the curb must be
level.
If the unit is installed at ground level, elevate it above
the snow line. Provide concrete footings at each
support location with a “full perimeter” support
structure or a slab foundation for support. Refer to
for the unit’s operating and point loading
weights when constructing a footing foundation.
If anchoring is required, anchor the unit to the slab
using hold down bolts or isolators. Isolators should be
installed to minimize the transmission of vibrations
into the building.
For rooftop applications, if anchoring is required,
anchor the unit to the roof with hold-down bolts or
isolators.
Check with a roofing contractor for proper
waterproofing procedures.
Ductwork
Elbows with turning vanes or splitters are
recommended to minimize air noise due to turbulence
and to reduce static pressure.
When attaching the ductwork to the unit, provide a
watertight flexible connector at the unit to prevent
operating sounds from transmitting through the
ductwork.
All outdoor ductwork between the unit and the
structure should be weather proofed after installation is
completed.
N
No
otte
e:: For sound consideration, cut only the holes in the
roof deck for the ductwork penetrations. Do not
cut out the entire roof deck within the curb
perimeter.
If a Curb Accessory Kit is not used:
1. The ductwork can be attached directly to the
factory-provided flanges around the unit’s supply
and return air openings. Be sure to use flexible duct
connections at the unit.
2. For “built-up” curbs supplied by others, gaskets
must be installed around the curb perimeter flange
and the supply and return air opening flanges.
General Unit Requirements
W
WA
AR
RN
NIIN
NG
G
P
Prro
op
pe
err F
Fiie
elld
d W
Wiirriin
ng
g a
an
nd
d G
Grro
ou
un
nd
diin
ng
g
R
Re
eq
qu
uiirre
ed
d!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w cco
od
de
e cco
ou
ulld
d rre
essu
ulltt iin
n d
de
ea
atth
h o
orr
sse
erriio
ou
uss iin
njju
urry
y..
A
Allll ffiie
elld
d w
wiirriin
ng
g M
MU
US
ST
T b
be
e p
pe
errffo
orrm
me
ed
d b
by
y q
qu
ua
alliiffiie
ed
d
p
pe
errsso
on
nn
ne
ell.. IIm
mp
prro
op
pe
errlly
y iin
nsstta
alllle
ed
d a
an
nd
d g
grro
ou
un
nd
de
ed
d
ffiie
elld
d w
wiirriin
ng
g p
po
osse
ess F
FIIR
RE
E a
an
nd
d E
EL
LE
EC
CT
TR
RO
OC
CU
UT
TIIO
ON
N
h
ha
azza
arrd
dss.. T
To
o a
av
vo
oiid
d tth
he
esse
e h
ha
azza
arrd
dss,, y
yo
ou
u M
MU
US
ST
T ffo
ollllo
ow
w
rre
eq
qu
uiirre
em
me
en
nttss ffo
orr ffiie
elld
d w
wiirriin
ng
g iin
nsstta
alllla
attiio
on
n a
an
nd
d
g
grro
ou
un
nd
diin
ng
g a
ass d
de
essccrriib
be
ed
d iin
n N
NE
EC
C a
an
nd
d y
yo
ou
urr llo
occa
all//
sstta
atte
e//n
na
attiio
on
na
all e
elle
eccttrriicca
all cco
od
de
ess..
The checklist listed below is a summary of the steps
required to successfully install a commercial unit. This
checklist is intended to acquaint the installing
personnel with what is required in the installation
process. It does not replace the detailed instructions
called out in the applicable sections of this manual.
☐
Check the unit for shipping damage and material
shortage; file a freight claim and notify appropriate
sales representative.
☐
Verify correct model, options and voltage from
nameplate.