Water Piping
Bolt-Tightening Sequence for
Water Piping Connections
A bolt-tightening sequence for
flanges with flat gaskets or O-rings is
described below and shown in
Figure 19. Remember that
improperly tightening flanges may
cause a leak!
Note:
Before tightening any of the
bolts, align the flanges. Flange bolt
torque requirements are given in
Table 7.
Flanges with 4, 8 or 12 Bolts.
Tighten all bolts to a snug tightness,
following the appropriate numerical
sequence for the flange. Repeat this
sequence to apply the final torque to
each bolt.
Flanges with 16, 20 or 24 Bolts.
Following the appropriate numerical
sequence, tighten only the first half
of the total number of bolts to a snug
tightness. Next, sequentially tighten
the remaining half of the bolts in the
proper order.
Flanges with More than 24 Bolts.
Refer to Figure 19 and sequentially
tighten the first 12 bolts to a snug
tightness. Tighten the next 12
consecutively numbered bolts in
sequence, to the final torque.
Then, apply final torque to the first
12 bolts and the bolts not yet
tightened (i.e., unnumbered bolts in
Figure 19). Be sure to start with bolt
“1” and move progressively around
the flange in a clockwise direction.
Evaporator Water Box Covers.
See Figure 19. Ensure that the water
box head rests tightly against the
gasket or tube sheet; then snugly
tighten the bolts in sequential order.
If excessive tube sheet crown
prevents the head from contacting
the tube sheet, tighten the bolts
located where the greatest gaps
occur. Be sure to use an equal
number of bolt turns from side to
side.
Then, apply final torque to each bolt
in sequential order. (Each bolt is
identified by number in Figure 19.)
Table 7 – Flange Bolt Torque Recommendations for O-Ring and Flat-Gasket
Piping Connections (See Note).
Bolt Size
Gasket Type
(In)
O-Ring
Flat
3/8
25 (34)
12-18 (16-24)
1/2
70 (95)
33-50 (45-68)
5/8
150 (203)
70-90 (95-122)
3/4
250 (339)
105-155 (142-210)
Note:
Torques provided in Ft./Lbs. (Newton/metres)
Summary of Contents for Duplex Water-Cooled Hermetic CenTraVac
Page 10: ...CDHF SVN01B EN 10 Figure 2 Typical CDHF Chiller General Information ...
Page 38: ...CDHF SVN01B EN 38 Vent Line Piping Figure 20B Continued ...
Page 39: ...39 CDHF SVN01B EN Vent Line Piping Figure 20C Continued ...
Page 40: ...CDHF SVN01B EN 40 Vent Line Piping Figure 21 Rupture Disc Vent Pipe Sizing ...
Page 42: ...CDHF SVN01B EN 42 Figure 22 Recommended Areas for Unit Insulation ...
Page 59: ...59 CDHF SVN01B EN ...
Page 60: ...CDHF SVN01B EN 60 ...
Page 61: ...61 CDHF SVN01B EN ...
Page 62: ...CDHF SVN01B EN 62 ...
Page 63: ...63 CDHF SVN01B EN ...
Page 64: ...CDHF SVN01B EN 64 ...
Page 65: ...65 CDHF SVN01B EN ...
Page 66: ...CDHF SVN01B EN 66 ...
Page 67: ...67 CDHF SVN01B EN ...
Page 68: ...CDHF SVN01B EN 68 ...
Page 69: ...69 CDHF SVN01B EN ...
Page 70: ...CDHF SVN01B EN 70 ...
Page 71: ...71 CDHF SVN01B EN ...
Page 72: ...CDHF SVN01B EN 72 ...
Page 73: ...73 CDHF SVN01B EN ...
Page 74: ...CDHF SVN01B EN 74 ...
Page 75: ...75 CDHF SVN01B EN ...
Page 76: ...CDHF SVN01B EN 76 ...
Page 77: ...77 CDHF SVN01B EN ...
Page 78: ...CDHF SVN01B EN 78 ...
Page 79: ...79 CDHF SVN01B EN ...