![Trane CVGF 1000 Operation And Maintenance Manual Download Page 77](http://html1.mh-extra.com/html/trane/cvgf-1000/cvgf-1000_operation-and-maintenance-manual_1149655077.webp)
CVGF-SVU02B-E4
77
Periodic Maintenance
Overview
Use of a periodic maintenance
program is important to ensure
the best possible unit
performance and efficiency.
Daily Maintenance Checks
Check the chiller’s evaporator
and condenser pressures, and
discharge oil pressure.
IMPORTANT:
IT IS HIGHLY
RECOMMENDED THAT THE
OPERATING LOG BE
COMPLETED ON A DAILY BASIS.
Check the oil level in the chiller oil
sump using the two sight glasses
provided in the oil sump head.
When the unit is operating, the oil
level should be visible in the lower
sight glass.
Weekly Checks
Check the following after the
machine has been in operation for
at least 30 minutes:
1. Chilled water and condenser
water entering and leaving
temperatures.
2. Current drawn by the
compressor (Amps).
3. Oil level in the oil sump. The oil
level must be visible in the sight
glass.
4. Condenser pressure, evaporator
pressure.
5. Unusual noise, vibration, and so
forth
It is strongly recommended that
unit readings and observations are
recorded on a weekly log sheet.
The acceptance of a warranty claim
may depend on this.
Annual Checks
The yearly maintenance should be
performed by an authorized Trane
service technician. It should include
weekly checks.
1. Check setting and operation of
all controls and safety devices.
2. Leak test the entire machine for
refrigerant leaks.
3. Check starter contactors for wear
and replace if required.
4. Check motor winding insulation.
5. Check motor amps draw.
6. Perform an oil analysis.
7. Perform vibration analysis.
8. Check and adjust the water flow
9. Check and adjust interlocks.
10. Clean condenser tubes.
Periodic
Maintenance
Summary of Contents for CVGF 1000
Page 87: ......