![Trane Adaptive Frequency VFDB Installation, Operation And Maintenance Manual Download Page 22](http://html1.mh-extra.com/html/trane/adaptive-frequency-vfdb/adaptive-frequency-vfdb_installation-operation-and-maintenance-manual_1148927022.webp)
Cabinet
22
VFDB-SVX001A-EN
Figure 6.
A-Frame: Bottom view (VFD 2300/3300/4160V), in.
4.92
5.81
14.47
14.47
5.81
5.98
5.24
47.83
5.24
5.98
5.98
5.24
14.47
5.81
1.46
1.37
47.83
.79
.79
.79
42.72
47.07
47.83
47.07
31.69
61.93
25.46
49.56
73.65
47.07
A
LINE CABLE
CONDUIT
OPENING
LOAD CABLE
CONDUIT
OPENING
(8.66X5.63)
CONTROL WIRE
CONDUIT OPENING
(3.93X3.93)
MOUNTING HOLES
FOR 0.72(18) DIA.
ANCHOR BOLTS
B
LINE CABLE
CONDUIT
OPENING
LOAD CABLE
CONDUIT
OPENING
(8.66X5.63)
CONTROL WIRE
CONDUIT OPENING
(3.93X3.93)
MOUNTING HOLES
FOR 0.72(18) DIA.
ANCHOR BOLTS
C
LINE CABLE
CONDUIT
OPENING
LOAD CABLE
CONDUIT
OPENING
(8.66X5.63)
CONTROL WIRE
CONDUIT OPENING
(3.93X3.93)
MOUNTING HOLES FOR
0.72(18) DIA. ANCHOR BOLTS