STEP 5
- Replace the pressure tap valve cores
after the service valves have cooled.
STEP 2
- Check for leaks by using a soapy solu-
tion or bubbles at each brazed location.
Remove nitrogren pressure and repair any leaks
before continuing.
Section 8. Refrigerant Line Leak Check
8.1 Check For Leaks
STEP 1
- Pressurize the refrigerant lines and
evaporator coil to 150 PSIG using dry nitrogen.
150 PSIG
Summary of Contents for 4TTR4018-060
Page 25: ...18 AC51D1 10E EN 25 PRINTED FROM D158513P01 018L Models PRINTED FROM D158515P01 060L Models...
Page 26: ...26 18 AC51D1 10E EN Section 17 Wiring Diagrams 018N 019N 024N 025N 042N 049N Models...
Page 27: ...18 AC51D1 10E EN 27 018N 019N 024N 025N 042N 049N Models...
Page 28: ...28 18 AC51D1 10E EN PRINTED FROM D157362P05 REVB 030N 036N 048N Models...
Page 29: ...18 AC51D1 10E EN 29 PRINTED FROM D157362P05 REVB 030N 036N 048N Models...
Page 30: ...30 18 AC51D1 10E EN 060N Models...
Page 31: ...18 AC51D1 10E EN 31 060N Models...
Page 34: ...34 18 AC51D1 10E EN 060L Models...