Trane 4NXCA018AC3HCA Installer'S Manual Download Page 5

18-AD28D1-2  

5

Installer’s Guide

Figure 12

Co

mf

or

TM

 

co

il

CASED COIL SHOWN INSTALLED HORIZONTAL LEFT WITH A DOWNFLOW

FURNACE AND HORIZONTAL ALIGNMENT BRACKETS

BRACKETS SHIP WITH 

DOWNFLOW FURNACES.

REQUIRED FOR ALIGNMENT

ON HORIZONTAL INSTALLATIONS.

AIRFLO

W

FURNA

CE

DUCT

SPLASH

GUARD

CASED COIL

Figure 11

Figure 10

CASED COIL CONNECTION 

BRACKET FOR DOWNFLOW 

FURNACE IN HORIZONTAL

CAUTION

!

Coil is pressurized with 10 to 20 psi nitrogen.  Remove 

the valve core on the pressure tap to release the pres-

sure before un-sweating the tubing caps.  If no pressure 

is released, check for leaks.  

Standoffs and screws (See Figure 13) are included with 

the cased coils for attachment to the furnace.  There are 
clearance alignment holes near the bottom of the coil wrap-
per.  Drill screws are used to engage the top flanges of the 
furnace.  The standoff is inserted into the cabinet alignment 
hole (See Figure 13). The  drill screws are inserted through 
the standoffs then screwed into the furnace top flange.  The 
coil is always placed downstream of the furnace airflow.  The 
coil and furnace must be fully supported when used in the 
horizontal position.  The standoffs and screws are strictly 
for securing alignment, not for support in horizontal.

Standoff

Drill Screw

Figure 13

Alignment Holes
on both sides.

3.  HORIZONTAL LEFT (All coils)

The non-condensing furnaces may be laid on either side 

for horizontal application.  The condensing downflow/hori-

zontal and upflow/horizontal  furnaces may only be rotated 

onto their left side.  Connection brackets for coil/furnace 

alignment are included with the furnaces.  
 

a. In horizontal left, the 

4NXC 

coil case is rotated so 

the apex of the coil is away from the furnace and the 

auxiliary drain pan is now on the lower side.

 

b. The two piece baffle ships installed on the coil and is 

required for horizontal left applications.

 

c. The base of the coil enclosure is placed flush against 

the downflow/horizontal furnace. Upflow/horizontal 

condensing furnaces have the coil match the top flange.

 

d. There are three brackets included with the downflow 

furnace which are used to connect the furnace and coil 

together. See Figure 10.  

 

e. Two brackets are used to attach the rear of the coil 

and furnace and one bracket is used to attach the front.  

The rear brackets will use existing screws on the coil 

enclosure (two on each side at the bottom).  Each of the 

rear brackets will be attached with the wide side of the 

bracket resting on the top and bottom of the horizontal 

coil and furnace (see Figure 11).  Four additional screws 

will be used to attach each rear bracket. 

 

f. The front bracket is positioned as close to the cen-

ter as possible with the narrow edge against the coil 

enclosure and the wide edge against the furnace .  Two 

screws each are driven into the coil enclosure and fur-

nace.

 

g. There is a splash guard packaged with the coil.  This 

guard is for horizontal left coil installation only.  The 

guard has a bend which is inserted into the front chan-

nel of the horizontal drain pan on the outlet air side 

of the coil case.  The guard is then rotated downward 

until it rests in the drain pan.  One sheet metal screw 

is driven through the coil case duct flange on the front 

side and into the splash guard side hole.  See Figure 12.

Summary of Contents for 4NXCA018AC3HCA

Page 1: ...ile Home use The height of the Furnace Coil and discharge duct work must be 7 ft or less Inspect the coil for shipping damaged Notify the transporta tion company immediately if the coil is damaged B A...

Page 2: ...ews See Figure 2 b Replace only the top baffle using the same screws previously removed c The 2 outer water diverter baffles and the two piece factory baffle must be removed and the top baffle replace...

Page 3: ...same screws previously removed c Installation of the 1 2 wide gasket behind the front and back triangular baffles is required for downflow ap plications d Remove the coil by sliding the coil out of t...

Page 4: ...ombustible flooring a Place the coil case on the furnace supply air ple num b Secure the coil case to the plenum c Set the furnace on top of the coil case making sure that the back side of the dischar...

Page 5: ...brackets for coil furnace alignment are included with the furnaces a In horizontal left the 4NXC coil case is rotated so the apex of the coil is away from the furnace and the auxiliary drain pan is no...

Page 6: ...rflow for horizontal right installation This placement supersedes previous furnace Installer s Guide stating install with the apex of the coil pointing in the direction of airflow for horizontal appli...

Page 7: ...ANT LINES 1 The following steps are to be considered when installing the refrigerant lines a Determine the most practical way to run the lines b Consider types of bends to be made and space limita tio...

Page 8: ...he drain line to prevent sweating and dripping It is always recommended that an auxiliary drain pan be in stalled under a horizontally installed evaporator coil or 90 gas furnace Connect the auxiliary...

Page 9: ...2 18 1 4 22 1 2 OVERALL WIDTH B IN 14 1 2 17 1 2 17 1 2 OPENING WIDTH C IN 13 5 8 16 5 8 16 5 8 TOP OPENING D 12 3 4 15 3 4 15 3 4 GAS CONNECTION 3 4 BRAZE LIQUID CONNECTION 3 8 BRAZE MATCHED FURNACE...

Page 10: ...ARY DRAIN 3 4 NPT FOR VERTICAL POSITION PRIMARY DRAIN 3 4 NPT FOR VERTICAL POSITION 18 1 8 OPENING IN WRAPPER 21 1 2 3 1 8 7 8 19 3 8 MODEL 4NXCD063BC3HCA WEIGHT LBS 80 REFRIGERANT CONTROL TXV NON BLE...

Page 11: ...the refrigerant system 17 Charge the system per the charging instructions with the outdoor unit P TXV CHANGE OUT 1 Unbraze the liquid line field connection 2 Remove the front panel and manifold panel...

Page 12: ...decrease Measure superheat at indoor coil while placing the bulb in an ice and water bath for one minute Does superheat increase YES Replace the TXV NO TXV is OK NO Is superheat 20F NO YES NO Is indoo...

Reviews: