Trane 4NXCA018AC3HCA Installer'S Manual Download Page 2

© Trane 2013     

   18-AD28D1-2

Installer’s Guide

Standoffs and screws (See Figure 4) are included with 

the   cased coils for attachment to the furnace.  There are 
clearance alignment holes near the bottom of the coil wrap-
per.  Drill screws are used to engage the top flanges of the 
furnace.  The standoff is inserted into the cabinet alignment 
hole (See Figure 4). The  drill screws are inserted through 
the standoffs then screwed into the furnace top flange.  The 
coil is always placed downstream of the furnace airflow.  The 
above instructions apply if the coil is on top of an upflow 
furnace. 

CAUTION

!

Coil is pressurized with 10 to 20 psi nitrogen.  Remove 

the valve core on the pressure tap to release the pres-

sure before un-sweating the tubing caps.  If no pressure 

is released, check for leaks.  

Figure 2

Standoff

Drill Screw

Figure 4

C.  RECOMMENDATION
If a coil is part of the total system installation, use the Install-
er’s Guide packaged with the furnaces, and outdoor sections, 
and thermostat for physically installing those components.
D.  FURNACE IN UPFLOW POSITION

1.  UPFLOW COIL CONVERSION (Model 4NXCD063 

only) 

a.  Remove the factory installed two-piece baffle as-

sembly from the apex of the coil by removing the 5/16” 

hex head screws.  See Figure 2.

 

b.  Replace only the top baffle using the same screws 

previously removed. 

 

c.  The (2) outer water diverter baffles and the two 

piece factory baffle must be removed and the top baffle 

replaced for maximum efficiency.

 

d.  Remove the coil by sliding the coil out of the coil 

enclosure.

 

e.  Remove the (2) outer water diverter baffles by 

removing the 5/16” hex head screws.  See Figure 3.

Alignment Holes
on both sides.

UPFLO

W

FURNA

CE

CASED

COIL

SCREWS

(BOTH SIDES)

STANDOFFS

(BOTH SIDES)

STANDOFFS (4)

DRILL SCREWS (4)

FOR VERTICAL  

INSTALLATIONS:

Figure 3

Remove
and 
Discard

Replace

2.  UPFLOW GAS FURNACE 

 

a.  Turn furnace power OFF and remove the flue pipe if 

necessary.

 

b.  Apply gasket material (duct seal field supplied) to 

ALL mating surfaces between the furnace and the coil 

case.

 

c.  Set the coil case on top of the furnace.  Connect the 

ductwork to the coil case.

 

d.  Replace the furnace flue pipe if it has been removed 

and fasten it securely.

 

e.  Turn the furnace power ON.

3.  UPFLOW GAS FURNACE - Add-on Cooling

 

a. Turn furnace power OFF and remove the flue pipe if 

necessary.

 

b. Disconnect and remove a sufficient portion of the 

supply ductwork to provide clearance for the cased coil.

 

c. Install the cased  coil following the Installation In-

struction section D-1 of these instructions.

 

d. Reconnect the ductwork to the coil case.

 

e. Replace the furnace flue pipe if it has been removed 

and fasten it securely.

 

f. Turn the furnace power ON.

Summary of Contents for 4NXCA018AC3HCA

Page 1: ...ile Home use The height of the Furnace Coil and discharge duct work must be 7 ft or less Inspect the coil for shipping damaged Notify the transporta tion company immediately if the coil is damaged B A...

Page 2: ...ews See Figure 2 b Replace only the top baffle using the same screws previously removed c The 2 outer water diverter baffles and the two piece factory baffle must be removed and the top baffle replace...

Page 3: ...same screws previously removed c Installation of the 1 2 wide gasket behind the front and back triangular baffles is required for downflow ap plications d Remove the coil by sliding the coil out of t...

Page 4: ...ombustible flooring a Place the coil case on the furnace supply air ple num b Secure the coil case to the plenum c Set the furnace on top of the coil case making sure that the back side of the dischar...

Page 5: ...brackets for coil furnace alignment are included with the furnaces a In horizontal left the 4NXC coil case is rotated so the apex of the coil is away from the furnace and the auxiliary drain pan is no...

Page 6: ...rflow for horizontal right installation This placement supersedes previous furnace Installer s Guide stating install with the apex of the coil pointing in the direction of airflow for horizontal appli...

Page 7: ...ANT LINES 1 The following steps are to be considered when installing the refrigerant lines a Determine the most practical way to run the lines b Consider types of bends to be made and space limita tio...

Page 8: ...he drain line to prevent sweating and dripping It is always recommended that an auxiliary drain pan be in stalled under a horizontally installed evaporator coil or 90 gas furnace Connect the auxiliary...

Page 9: ...2 18 1 4 22 1 2 OVERALL WIDTH B IN 14 1 2 17 1 2 17 1 2 OPENING WIDTH C IN 13 5 8 16 5 8 16 5 8 TOP OPENING D 12 3 4 15 3 4 15 3 4 GAS CONNECTION 3 4 BRAZE LIQUID CONNECTION 3 8 BRAZE MATCHED FURNACE...

Page 10: ...ARY DRAIN 3 4 NPT FOR VERTICAL POSITION PRIMARY DRAIN 3 4 NPT FOR VERTICAL POSITION 18 1 8 OPENING IN WRAPPER 21 1 2 3 1 8 7 8 19 3 8 MODEL 4NXCD063BC3HCA WEIGHT LBS 80 REFRIGERANT CONTROL TXV NON BLE...

Page 11: ...the refrigerant system 17 Charge the system per the charging instructions with the outdoor unit P TXV CHANGE OUT 1 Unbraze the liquid line field connection 2 Remove the front panel and manifold panel...

Page 12: ...decrease Measure superheat at indoor coil while placing the bulb in an ice and water bath for one minute Does superheat increase YES Replace the TXV NO TXV is OK NO Is superheat 20F NO YES NO Is indoo...