TRAK Machine Tools

 

Site Preparation Guide 
TRAK DPMRX5 

                                                                                                                                               F16467-46 Rev 062518 

Page 4 of 4 

Method 2 (see Figure 2): 

1.

 

Insert 2 steel bars 1" dia x 36" long through both sides in 
the existing holes in the machine base (front and back).  

2.

 

Position 4 (two each side) wood vee blocks under the steel 
bars and over a suitable lift truck. 

3.

 

Lift the machine up (somewhat tilted towards the front) 4-
6" from the ground and move it to its floor plan position. 

 

WARNING! 

The lift truck must have sufficient lifting capacity (3 tons) and 
be equipped with suitably long forks for the DPMRX5.  

4.

 

Insert the 6 screws for the leveling pads in their place in 
the bed. 

5.

 

Place the machine in its location (see floor plan 

bed/footprint) carefully positioning each leveling pad under 
each leveling screw. 

 

Figure 2 

Lifting the Machine Method 2 

 

 

 

 