TRAK Machine Tools
Site Preparation Guide
TRAK DPMRX5
F16467-46 Rev 062518
Page 4 of 4
Method 2 (see Figure 2):
1.
Insert 2 steel bars 1" dia x 36" long through both sides in
the existing holes in the machine base (front and back).
2.
Position 4 (two each side) wood vee blocks under the steel
bars and over a suitable lift truck.
3.
Lift the machine up (somewhat tilted towards the front) 4-
6" from the ground and move it to its floor plan position.
WARNING!
The lift truck must have sufficient lifting capacity (3 tons) and
be equipped with suitably long forks for the DPMRX5.
4.
Insert the 6 screws for the leveling pads in their place in
the bed.
5.
Place the machine in its location (see floor plan
bed/footprint) carefully positioning each leveling pad under
each leveling screw.
Figure 2
Lifting the Machine Method 2