TOWBAR INSTALLATION INSTRUCTIONS
PART NUMBER KM23L
KIA CERATO BD CL2
49-75 Pacific Drive Keysborough, VIC 3173
Phone: 1800 812 017
Email:
REV A
Page 11
Issue Date: 31-05-19
29.
Route the white and blue connector on the larger
trailer patch harness (102111-WL) (1) from the inside
of the vehicle through the drilled grommet hole (2) to
the outside.
30.
Seat grommet (2) in hole.
Note: Keep harness routing clear of all sharp edges,
moving parts and places of extreme heat.
Note: Ensure grommet is seated correctly and makes
a good seal.
31.
At the RHS tail light, patch in the harness connectors
(1) in between the vehicle harness (2) and the tail
light harness (3).
32.
Using the supplied M6 flange nut, secure the star ring
terminal (4) to the vehicle stud (5).
Note: Ensure the star ring terminal bites into the
chassis to provide a clean earth connection.
33.
Using an alcohol wipe, clean a suitable sheet metal
area (1) and the underside of the ECU (04836) (2).
34.
Connect the trailer patch 12-way connector (3) to the
ECU.
35.
Apply double sided tape to the ECU (2) and secure it
to the vehicle sheet metal.
Note: Mount the ECU, ensuring the connector is
orientated downwards.