![TraffiCalm Wrong Way Alert M75-DETCA-0000 Operation Manual Download Page 8](http://html.mh-extra.com/html/trafficalm/wrong-way-alert-m75-detca-0000/wrong-way-alert-m75-detca-0000_operation-manual_1148296008.webp)
8
Introduction
Typically most systems are installed at this point. However, it is
still beneficial to understand how the individual components
are deployed in the field, especially where maintenance will be
required.
In this section we will detail each component and notes on its
installation.
Typical installation procedure...
1. Affix LED enhancment ring to sign face (if needed)
2. Install Controller or Collaborator
3. Install supporting power supply (solar panel, battery box, AC
inverter, etc.)
4. Install Radar high on post
5. Install sign and LED ehnacement ring to post
6. Make all connections between devices
7. Power on Collaborators
8. Power On Controller
9. Configure System
⟨Installation⟩
Mounting Methods
Various methods can be used to mount our components. An
installation kit is supplied which contains bolts for mounting to square
posts and banding brackets for mounting to round posts or unusual
infrastructure. No banding or banding tool is supplied. Where banding
is used, it is recommended that 3/4” banding be double wrapped to
ensure maximum stability in windy and icy conditions.
Some of our solar panel brackets require large u-bolts (not supplied)
not readily available. It is highly recommended this be planned for and
purchased accordingly. They are the best possible way to mount our
solar panels to ensure years of trouble free service.
ALWAYS ensure the antennas have clear line of site
to the Controller!(!!!)
NOTE: It is prudent to take note of each Collaborator’s ID
number and location before installing on the post!
Summary of Contents for Wrong Way Alert M75-DETCA-0000
Page 22: ...22 Notes ...
Page 23: ...23 Notes ...