background image

CARE AND OPERATION

PAGE 14

BREAK-IN PERIOD

Your stove finish is a high temperature paint that requires
time and temperature to completely cure. We recom-
mend that you ventilate the house during the initial burns.
The paint emits non-toxic odors during this process.

KEEP YOUR HOUSE WELL VENTILATED DURING
THE CURING PROCESS TO PREVENT ACTIVATION
OF YOUR HOME SMOKE DETECTOR.

The paint manufacturer recommends three burn cycles to
cure the paint. The first two burns should be low heat,
approximately 250°F., for 20 minutes each, using paper
and light kindling.

After each 20-minute burn, allow the appliance to cool
completely. The third burn should be at least medium
high or about 450°F. for 45 - 60 minutes. The paint will
become soft and emit non-toxic haze during these burns.
Keep the area well ventilated.

As the paint cures it will become slightly lighter in color.
Eventually the entire surface will become an even color.
Once the paint has been softened and cooled two or
three times, it will harden. Do not turn on a blower during
the curing process.  Do not place anything on the stove
surface until the paint is completely cured. Do not attempt
to repaint the stove until the paint is completely cured. If
the surface later becomes stained or marred, it may be
lightly sanded and touched up with spray paint from the
same paint manufacturer (See 

Small Area Paint Touch-

Up

, page 17). Paint is available at your local authorized

Lennox Hearth Products dealer. Never attempt to paint a
hot stove.

CATALYTIC COMBUSTOR

During the start-up of a cold stove, a medium to high fir-
ing rate must be maintained for about 20 – 25 minutes.
The high firing rate will ensure that the stove, the flue, the
catalyst, and the fuel are all stabilized at proper operating
temperatures. If the optional temperature probe is used,
even though it may reach a temperature of 600° F. within
only two or three minutes after the fire is started, do not
set the primary air control to the "LOW" position until ap-
proximately 20-25 minutes have passed.  Setting the
primary air control on "LOW" too early could result in ei-
ther the fire or the catalytic combustor going out.

HOW TO START AND MAINTAIN A FIRE

1.  OPEN the bypass damper control by pulling it toward

you. In the OPEN position the draft air will bypass the
catalytic combustor and make starting the fire easier.

2.   Set the primary air control lever on HIGH. The HIGH

setting will maximize your primary combustion air.

3.  Build a fire directly on the firebrick covering the bottom

of the stove.

a.  Place five or six loosely crumpled sheets of

newspaper in the stove.

b.  Add a small amount of dry kindling randomly on

the top of the newspaper.

c.  Place a few more loosely crumpled newspapers

on top of the kindling and light the bottom paper
first, then light the top paper.

4. Once the kindling is ignited and burning on its own,

close the fuel door. The upper fire should help preheat
the chimney and create an effective draft while the
lower fire ignites the kindling.

5. When the kindling is burning well, add increasingly

larger pieces of wood until the fire is actively burning.

6.  When the fire is well established, close the bypass by

pushing the control rod in. The optional catalytic tem-
perature probe should read 500-600°F (It takes ap-
proximately 20 - 25 minutes to reach this tempera-
ture).

7.  Set the primary air control to the desired setting. Your

stove will now provide efficient and safe heat for your
home.

f i r e - p a r t s . c o m

Summary of Contents for T150C

Page 1: ...THIS APPLIANCE MUST BE INSTALLED BY A QUALIFIED TECHNICIAN READ MANUAL THOROUGHLY BEFORE INSTALLATION RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE INSTALLATION AND OPERATION MANUAL Ce manuel d inst...

Page 2: ...ABLE FLUIDS SUCH AS GASOLINE NAPHTHA OR ENGINE OIL 9 Never use gasoline gasoline type lantern fuel kerosene charcoal lighter fluid or similar liq uids to start or freshen up a fire in this heater Keep...

Page 3: ...rble is used Place pad under top marble and strips under ash lip marble USING THIS MANUAL Please read and carefully follow all of the instructions found in this manual Please pay special attention to...

Page 4: ...IONS THIS APPLIANCE IS EQUIPPED WITH A THREE PRONG GROUNDING PLUG FOR YOUR PROTEC TION AGAINST SHOCK HAZARD AND SHOULD BE PLUGGED DIRECTLY INTO A PROPERLY GROUNDED THREE PRONG RE CEPTACLE DO NOT CUT O...

Page 5: ...used In some cases if the k value is less or the r value higher a thinner material may be used Methods of determining floor protection equivalents To determine the thickness required for any material...

Page 6: ...A CHIMNEY SYS TEM SERVING ANOTHER STOVE APPLIANCE OR ANY AIR DISTRIBUTION DUCT FAILURE TO FOL LOW THESE INSTRUCTIONS WILL VOID THE MANUFACTURERS WARRANTY If you plan to vent your stove into an existi...

Page 7: ...nd air transfer Other appliances in the dwelling also contribute to re moving air from the dwelling i e clothes dryers exhaust fans fireplaces and other fuel burning appliances If the available fresh...

Page 8: ...ion To A Factory Built Chimney This space heater is to be connected to a factory built chimney con forming to CAN ULC S629 Standard for 650 C Fac tory Built Chimneys For Reduced Residential Clearances...

Page 9: ...on byproducts from the ap pliance If the venting system s design does not promote these ends the system may not function properly Poorly functioning venting systems may create performance problems as...

Page 10: ...INSTALLATION PAGE 10 RESIDENTIAL INSTALLATION DIAGRAM fire parts com...

Page 11: ...stening supports to chimney length do not penetrate the chimney liner the inside wall of the Solid Pak chimney The inner end of the Solid Pak chimney section shall be flush with the inside of the maso...

Page 12: ...a conventional stove The catalytic combustor is designed to make use of this en ergy converting it into useful heat as it lessens chimney creosote build up and air pollution The catalytic com bustor c...

Page 13: ...tion air located above the fuel door Slide the control to the right for a slower burn rate to the left for a higher burn rate It may take a while to get accustomed to the sensitive draft control Small...

Page 14: ...s The high firing rate will ensure that the stove the flue the catalyst and the fuel are all stabilized at proper operating temperatures If the optional temperature probe is used even though it may re...

Page 15: ...Ensure blower is turned off during start up and refueling as it will af fect the accuracy of temperature probe reading If the stove has been burning on a medium to high burn rate for approximately 20...

Page 16: ...that produces heat from a woodstove is the wood It needs to be well seasoned natural wood What does Well Seasoned mean When a tree is cut down the wood is green full of sap and moisture This moisture...

Page 17: ...d the side windows have a 1 8 3 2 mm thick lytherm gasket Should these gaskets become frayed or damaged they should be replaced with the same size and type as the original gasket Contact your dealer f...

Page 18: ...ovincial fire authority for information on how to handle a chimney fire Have a clearly understood plan for handling a chimney fire CATALYST REPLACEMENT The normal expected life of a catalyst catalytic...

Page 19: ...ed is sufficient for most users Reinstall the combustor set according to the following instructions 1 Disconnect pipe from stove flue outlet 2 Looking down into stove flue remove the bypass operating...

Page 20: ...as long or as well as seasoned hardwood resulting in a short burn time 1 Wood size too small Burns at too rapid a rate 2 The gasket seal on the fuel door or glass is leaking air Repair or replace it...

Page 21: ...required flow of combustion air to the fire chamber and for safely re moving unwanted combustion byproducts from the appli ance If the venting system s design does not promote these ends the system m...

Page 22: ...r Size 6 152 mm Approx Burn Time 8 12 hours Fuel Capacity 55 lbs 25 kg Loading Front Catalyst Standard Width 27 686 mm Depth 22 5 572 mm Height to flue 29 737 mm Height 26 5 673 mm Approx Weight With...

Page 23: ...Assembly 6 Also requires 28M09 Gasket Kit 26M78 Top Cast Stove Heat Shield Parts 29108 Shield Bottom Heat 29110 Shield Rear Heat Firebox Parts See Brick Diagram For Brick Part Number Z SC 103 Combusto...

Page 24: ...COMPONENT DIAGRAMS T150C PAGE 24 FIREBRICK 1 thick Part Qty Dimensions FB 1 9 9 x 4 Regular Top View Showing Brick Installed CATALYTIC COMBUSTOR System Components fire parts com...

Page 25: ...PK B Touch up Spray Paint Kit Black 12 oz Spray Can Blower Kit BK T15 A Blower Kit includes rheostat for variable speed control is available for increased heat circulation Blower Variable Speed Contro...

Page 26: ...SAFETY LISTING LABEL PAGE 26 fire parts com...

Page 27: ...EPA LABEL Page 27 fire parts com...

Page 28: ...RSHIP RECORDS Dealer s Name Dealer s Address City State Zip Code Serial Number Date of Purchase Date Installed Notes SERVICE AND MAINTENANCE LOG Service Service Service Date Technician Description fir...

Page 29: ...1110 West Taft Avenue Orange CA 92865 fire parts com...

Reviews: