![Tractel HF 32/2/A Operating And Maintenance Manual Download Page 3](http://html.mh-extra.com/html/tractel/hf-32-2-a/hf-32-2-a_operating-and-maintenance-manual_1147620003.webp)
MS 32/2/A R 03/03
3
INSTALLATION OF HF 32/2/A LOAD CELL
Components of the load cell
A- 2 m connecting cable
B- Flat washer.
C- Adjusting pin.
D- Locking ring.
E- Load cell body.
Procedure for installing load cell
Essential condition : the hook of the lifting system should be free of any load.
- Position the adjusting pin as a function of the load range and wire rope diameter (see p. 4).
- Remove the tightening bracket (K).
- Position the load cell on the wire rope near the dead end/fixed point. The connecting cable
should be uppermost.
- Replace the tightening bracket (K) ensuring that it is correctly positioned depending on the
diameter of the wire rope. (See page 4)
-Adjust the tightening screws (J) symetrically (+/- 0.5 kgm) to ensure that there is no risk of
moving the load cell out of line with the wire rope. Excessive tightening may break the
bracket.
- Operate the lifting system up to the upper limit switch and ensure that the sheaving or
bottom block does not foul the load cell. If this happens adjust the upper limit switch so that
there is an appropriate distance between the load cell and the bottom block. Also check that
when the bottom block is in the upper position the load cell is not in contact with the
overhead crane.
- Wire the connecting cable from the load cell t the control box. Ensure that the cable is
secured.
F- Locking nut
G- Tare screw.
H-Traction part.
I- Safety washer.
J- Tightening screw.
K-Tightening bracket.
L-Rubber compression pad.
M-Wire rope.
N- Fixing screws for circuit
breaker.(do not touch)
Fig. 1
A
B
C
D
E
H
F
G
I
J
K
L
M
N
Summary of Contents for HF 32/2/A
Page 8: ...MS 32 2 A R 03 03 8 NOTES ...