
7
www.tpcdental.com
7.
Remove the cosmetic rings from the side box figure 7.1. Place the cosmetic over the end
of the delivery unit flex arm Figure 7.2. Once in place, route all lines and feed them
through the bushing assembly shown in figure 7.3. Verify that the arm seats completely
down on the bushing assembly. Lower the cosmetic ring to cover the seam between the
arm and utility center cover.
8.
Route the delivery system foot control and feed it through the bottom of the PMU figure
8.1. Make the following connections from your foot control to the tubing within the PMU
side box. Large yellow to Grey on foot control X2. Small grey on foot control to the clear
tubing to unit head for water relay connection. Figure 8.2.
Figure 7.1
Figure 7.2
Figure 7.3
Figure 8.1
Figure 8.2