Power module 

Support Pluggable type two power module. You can chose AC or DC power 
supply, optional 

2 Pre-Installation Preparation 

2.1  Power Requirement 

The input voltage must be stable, no EMI noise and distortion. 

When use DC power supply, the input voltage is -48VDC, the allowed range is -36 ~ -72 VDC. 

When use AC power supply, the input voltage is 110/220VAC, the allowed range is 90 ~ 264VAC. 

Note: Follow all security specification and the rule about the electricity in the locality or the 
building. All power supply must be legal. 

2.2  Equipment Ground 

The grounding body must be configured in the machine room, the grounding resistance value is 
less than 1Ω. It can be realize by layout the anti-static copper nose. 

2.3  Room Design Requirements 

The environment of the equipment operation has very big effect on its long-term  reliable 
operation .Room design requests to up to the following standards: 

 

The device allows room temperature is 0 ° C ~ 40 ° C. To ensure that equipment works in the 

normal temperature environment (25 ° C or so), should try to make the equipment away from 
the main heat source (such as power supply, etc.), if the environment temperature is higher 
than 40 ° C, should try to improve the ventilated condition of the room, such as install fan in 
the frame or air conditioning in the room. The ventilation pipe in the room should be swept 
clean and ventilated, etc.; 

 

There must be the good cable wiring and go line space in the room. Cable and optical cable 

wiring (including fiber splicing work) are already in place. 

 

The related humidity 10%

95%, No condensation, no frost; 

 

The dust particles density with more than 5μm in diameter

3.0*104/m3 ; Dust particles is a 

non-conductive, the non-magnetic and the non-corrosive. 

3 Hardware Installation 

3.1  Open package and checkout 

According to the packing list or supply contract, check and verify the goods, if any component is 
loss, wrong or damaged, please contact with your customer manager. 

The list includes the following content normally: 

 

1 OLT Machine(1 Pcs) 

 

SFP modules are ordered according to user requirement 

Summary of Contents for P1200-08

Page 1: ...Installation User Guide GPON OLT P1200 08 Version V1 0...

Page 2: ...s are trademarks or registered trademarks of their respective holders No part of the specifications may be reproduced in any form or by any means or used to make any derivative such as translation tra...

Page 3: ...n 5 3 3 1 Plane stack installation 5 3 3 2 Rack Installation 5 3 4 Port and Connection 6 3 4 1 Uplink Port 6 3 4 2 PON Port Connection 7 3 4 3 Ground Cable Connection 8 3 4 4 Management Port Connectio...

Page 4: ...he network applications Figure 1 1 P1200 08 in GPON system 1 2 Functional Features Comply with ITU T G 984 G 988 standards and China s Telecom industry GPON standards Support OMCI remote management of...

Page 5: ...ace The P1200 08 1U high Pizza Box can be mounted into the standard 19 rack Demission of machine frame 440mm L 391mm W 44mm H As shown below Figure 1 2 Front View of P1200 08 See the following table I...

Page 6: ...link with the OLT port n GE n n 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Flash There is the communication data at the uplink port n Green Always ON The uplink port n is connected OFF The uplink port n i...

Page 7: ...mperature is 0 C 40 C To ensure that equipment works in the normal temperature environment 25 C or so should try to make the equipment away from the main heat source such as power supply etc if the en...

Page 8: ...ent need connect the following equipment with OLT A management platform such as PC RJ45 DB9 RS232 Console line 3 3 OLT Installation OLT can be put in the bigger horizontal surface or within the standa...

Page 9: ...the cabinet Step IV Use screws to fix the suspension loops of the cabinet to the square holes of the 19 inch cabinet column and to fix the OLT device to the cabinet 3 4 Port and Connection The chapte...

Page 10: ...k connection Cable with RJ45 connectors at both sides Cable with LC connector at both sides Decide the port type of OLT according to the port type of the uplink device Switch or Route 3 4 1 3 Method o...

Page 11: ...t access marked as MGMT RJ45 type port Console access is really only required when initially configuring a device or if remote access fails Console access requires Console cable RJ 45 to DB 9 console...

Page 12: ...y unit Additionally to ensure true AC line input redundancy for the OLT you should connect each AC power cable to a different AC power source You can also connect an uninterruptible power supply UPS b...

Page 13: ...DC input power cable 3 5 OLT working status checkout 3 5 1 Check out power supply Before you connect the power supply double check the power supply if it is accord with the power supply requirements I...

Page 14: ...sword admin 5 Appendix OLT Specification Item Specification Chassis Rack 1U 19 inch standard box Slots 1 10 Gigabit uplink card slot 2 power module slot Uplink Port Copper 8 10 100 1000M auto negotiab...

Page 15: ...tate monitoring configuration management equipment log equipment upgrades equipment management user management Layer 2 switch configuration such as Vlan Trunk RSTP IGMP QOS etc PON management function...