061107-12 TC54.LP02.C
• BURNER
ASSEMBLY
(including pilot,manifold and
ceramic fi bre fi ller pieces)
• LOG GRATE (including upper
burner and pilot assembly)
• LOG
PACK
• EMBER MATERIAL (two bags)
• HARDWARE
PACKAGE
1. Attach the lower burner assembly to the fl oor of the fi rebox with
two screws. (Fig. # 1)
2. Attach the manifold supply tube from the lower burner to the front
bulk head fi tting and tighten. (Fig. # 2) Ensure that there are no
leaks.
Fig. #1
Fig. #2
2
Package
Contents
Burner / Grate Installation