T120.RHKIT 120913-28
5
5) Locate the Remote Blower Assembly in the
desired wall or ceiling location, maximum
20 ft. away from the unit, and secure to the
framing.
6) Attach the 3 1/4” x 10” Transition Boot to
the Remote Blower Assembly and seal with
aluminium duct tape. Run a 6” diameter
approved Type “B” venting between the
blower and the fi replace. Fasten in place with
screws and seal with aluminium foil tape.
7) Locate the make-up air inlet in a desired
location in the chase wall.
8) Attach fi nishing grills over both inlet and outlet
using the screws provided.
Fig. #5
BLOWER ASSEMBLY
HEAT DUCT
TRANSITION BOOT