tousek Rollco LWA 115/1A Installation And Operating Instructions Manual Download Page 10

- 10 - 

tousek

  /  E_LWA-115/1A_40800708  /  29. 10. 2018

2f.  Mounting the rolling gear covers 

Mounting

•  When installation of the cantilever system is finished put 

both parts of the covers on each rolling gear, one from the 

left and the other from the right, and push them together. 

Z

3

3

•  The plastic gear racks 

(Z)

 (parts of 49 cm length) have to 

be sequentially lead in the foreseen guiding at the profile. 

•  It has to be taken care that they touch each other without 

gaps. 

•  The two clampings 

(3) 

serve as fixation of the gear rack, 

they are also lead in the guiding for the gear rack at both 

ends of the profile and fixed with screws. 

 Attention

•  If a guide-in bracket (9) is used, the front clamping 

has to be mounted with at least 125 mm distance 

to the profile end, to make sure that the profile runs 

properly in the guide-in bracket !

 

2e.  Mounting the gear rack 

Mounting

125mm

Z

9

Summary of Contents for Rollco LWA 115/1A

Page 1: ...Installation and operating instructions Aluminium cantilever system Rollco LWA 115 1A...

Page 2: ...iding elements etc are sufficiently supportive and resistant for the purpose of gate automation Check also whether the product has transport damages After installation the proper function of the gate...

Page 3: ...support roller 4b back limit stop with rubber bumper 5a T head bolts single 5b T head bolts double 6 profile 7a b front back rolling gear and mounting plate in stainless steel 8 rolling gear cover 9...

Page 4: ...support roller and a guide in bracket have to be mounted in position gate CLOSED For the upper gate guiding a guide bracket with rollers and a guide in fork bracket have to be foreseen in gate positio...

Page 5: ...ing plate sliding gate operator center of cantilever system min 110 1 mounting plate guidance of gear rack foundation 12 5 350 380 116 5 120 85 55 273 M10 32 2 Mounting Aluminium cantilever system Rol...

Page 6: ...d at least be parted in 2 sections and equipped with diagonal ties Further important notes see page 4 These values are only standard values the gate frame has to be designed according to the static re...

Page 7: ...has to made sure that both rolling gears are standing in line e g by applying an aluminium lath Now bore the holes blow them out and drive in the heavy duty anchors Do exclusively use the supplied hea...

Page 8: ...the rubber bumpers show in direction of the rolling gears Vertical adjustment of the rolling gears A Drive gate in positon CLOSED and with adjusting bolt JS put up the indicated roller of the rear rol...

Page 9: ...assembly of the end plates it has to be taken care that they are executed in different ways The front end plate 1a has two plastic guidings at the sides and has to be mounted at the side of the profil...

Page 10: ...o be sequentially lead in the foreseen guiding at the profile It has to be taken care that they touch each other without gaps The two clampings 3 serve as fixation of the gear rack they are also lead...

Page 11: ...A 115 1A guide in bracket Rollco LWA 115 1A 20 25 35 77 30 77 82 5 103 5 145 96 5 85 5 120 Profile length 6 000mm 10mm 8 000mm 10mm 105 70 134 108 14 5 3 Dimensioned drawing Aluminium cantilever syste...

Page 12: ...7 Tel 48 32 738 53 65 Fax 48 32 738 53 66 info tousek pl Tousek s r o Czech Republic CZ 130 00 Praha 3 Jagellonsk 9 Tel 420 2 2209 0980 Fax 420 2 2209 0989 info tousek cz We reserve the right to chang...

Reviews: