
4
ENGLISH
INSTALLATION PROCEDURE
1. Mount the handle
assembly.
(1) Insert the HOT/COLD
water supply hoses into the
mounting hole.
(2) Pass the HOT/COLD
water supply hoses through
the gasket, the slip washer
and the mounting nut
(with groove) one by one.
Then, pass the nut of the
connecting pipe through
the groove and secure the
handle assembly. (ill. 1)
2. Mounting the spout
assembly.
(1) Set the gasket, the slip
washer and the mounting nut
(without groove) on the spout
and secure the spout. (ill.2)
IMPORTANT: Align the spout so that it comes out the center of the
mounting hole.
ill. 1
Section View
Handle
assembly
Lever
handle
Mounting
hole
Connecting
pipe
Gasket
Gasket
Slip
Washer
Mounting
nut
(with groove)
Hot water
supply hose
Groove
Cold water
supply hose
ill. 2
Section View
Spout
Gasket
Gasket
Slip washer
Mounting nut
Mixed supply
hose
Mounting
hole
IMPORTANT: Align the shaft
position so that the handle
assembly comes to the center
of the mounting hole.
(3) Connect the hoses to the supply lines. The left hose (marked with red
band) connects to the hot water supply. The right hose connects to the
cold water supply. Thighten with wrench as needed.
Summary of Contents for TLP02301U
Page 47: ......