4.Installation procedure
4-2.Installation of drain tube
Drain end of drainage fittings is inserted into ground drain tube for closely connection.
If drain end is too short, connection pipe can be used for insertion.
②
.Connecting thread pipe
G1 1/2
rubber gasket
teflon tape
①
.Connecting PVC pipe
PVC
glue-water
height
height of about 45~55mm
OD 40 PVC pipe
●
For side draining occasions, thread pipe is connected.
●
For direct draining occasions, thread pipe is connected.
Special connecting glue-water of PVC pipe must be used for sticking, fixing and
sealing the connected part between drain pipe and drain tool to avoid water leakage.
Always do this
①.
Connecting PVC pipe
②.
Connecting thread pipe
G1 1/2
rubber gasket
teflon tape
PVC glue-water
OD 40 PVC pipe
height
height of about 30~40mm
pipe tilt 1/50 or more
4-3. Fix the foot of bathtub with mortar
1. Measure bathtub with level bar.
5
m
m
level bar
* Note: (1) .Ensure space larger than 100mm over outer dimension of bathtub.
(2). Adjust leveling of bathtub with level bar. Keep about 3mm for clearance
between bathtub edge near wall and wall surface or masonry surface
NOTE:
We only provide the straight diain elbow,however,
customer need to buy the side drain elbow if they need.