background image

4.Installation procedure

4-2.Installation of drain tube

Drain end of drainage fittings is inserted into ground drain tube for closely connection. 

If drain end is too short, connection pipe can be used for insertion. 

.Connecting thread pipe

 

G1 1/2

rubber gasket

teflon tape

.Connecting PVC pipe

PVC 

glue-water

height

height of about 45~55mm

OD    40 PVC pipe

 ● 

For side draining occasions, thread pipe is connected.

 ● 

For direct draining occasions, thread pipe is connected.

Special connecting glue-water of PVC pipe must be used for sticking, fixing and 

sealing the connected part between drain pipe and drain tool to avoid water leakage.

Always do this

①.

Connecting PVC pipe

②.

Connecting thread pipe

G1 1/2

rubber gasket

teflon tape

PVC glue-water

OD    40 PVC pipe

height

height of about 30~40mm

pipe tilt 1/50 or more

4-3. Fix the foot of bathtub with mortar

1. Measure bathtub with level bar.

5

m

m

level bar

* Note: (1) .Ensure space larger than 100mm over outer  dimension of bathtub. 

            (2). Adjust leveling of bathtub with level bar. Keep about 3mm for clearance 

                  between  bathtub edge near wall and wall surface or masonry surface   

NOTE:

We only provide the straight diain elbow,however,

             customer need to buy the side drain elbow if they need.

Reviews: