6
ENGLISH
INSTALLATION PROCEDURE
5. Prepare the pivot arm by
placing one bushing on each
side of the pivot ball as shown.
Insert the short end of the rod
into the drain body and through
the eyelet hole in the plunger.
Fasten the pivot ball nut to
secure.
For LF series drain
Insert the drain lift rod thorugh the two (2)
holes in the square end of the connector
rod.
Slide the connector rod up the drain lift
rod to a suitable location so that the pivot
arm can pass through one of the mounting
holes as shown.
Secure the connector rod to the pivot
arm using the spring clamp. One end of
the spring clamp will need to be on the
pivot arm before the connector rod is as-
sembled.
Tighten the thumb screw in the connector
rod to secure it to the drain lift rod.
Conduct tests to ensure all the linkages are
working properly and no leaking occurs.
Adjust if needed.
Drain lift
rod
LF Series
Thumb
screw
Connector
rod
Connecting
spring piece
Pivot Arm
Lever
hole
Plunger
Short
end
Long
end
Bushings
Pivot Ball
Nut
Pivot Arm
Drain
lift rod
GR GS Series
Screw
Pivot
arm
Drain lift rod
connecting part
For GR-GS series drain
Insert the drain lift rod and
pivot arm into the drain lift
rod connecting part.
Tighten both rods with
screwdriver.