Total SAFT Flex'ion Series Transportation, Storage, Installation And Operation Instructions Download Page 6

Flex’ion®

WARNING: 

Always use insulated tools while working with Flex’ion® 
components and battery modules.

NOTE: 

Always use personal safety equipment while working with 
Flex’ion® components and battery modules. 

Figure 6: Power and Signal connectors

Figure 7: Check the maximum voltage of modules

Figure 8: BMM overview

Figure 9: POWER ON main switch

IMPORTANT: 

Full instructions are provided in the Flex’ion Installation & 
Commissioning (available to installation engineers certified 
by Saft) and Operating and Maintenance Manuals (available 
upon  request).

NOTE: 

Always use trained personnel when working with Flex’ion 
systems, components and battery modules. 

Battery Module, 46 Vdc

Battery Module, 23 Vdc

Battery Management Module (BMM)

Intelli-Connect™ and

Master BMM + PLC

Summary of Contents for SAFT Flex'ion Series

Page 1: ...t expose the unit to water or condensation Install the batteries in an area compatible with pollution level 2 according to EN 60664 1 typical of office or laboratory environments Do not place the batt...

Page 2: ...tteries If the Li ion battery module is identified as being damaged or defective has leaked sustained physical or mechanical damage or is defective for a safety reason it shall be packed in accordance...

Page 3: ...port to BMM 02 etc refer to Figure 6 Connect the MBMM signals to the customer s application when requested Connect the electrical power cables between battery modules BMM and Intelli Connect using ins...

Page 4: ...1 C P MFe Battery modules 11 D I C Intelli Connect with Master BMM 1 E CAB Signal and power cables 1 F DOC Documentation set 1 actual configuration is subject to design parameters Figure 3 Configurati...

Page 5: ...Flex ion Figure 4 System overview of standard 2 wire architecture of multi string system Figure 5 System overview of midpoint 3 wire architecture of multi string system...

Page 6: ...ge of modules Figure 8 BMM overview Figure 9 POWER ON main switch IMPORTANT Full instructions are provided in the Flex ion Installation Commissioning available to installation engineers certified by S...

Page 7: ......

Page 8: ...orth Haven Connecticut 06492 United States of America Tel 1 203 985 2700 Fax 1 203 985 2739 www saftbatteries com Doc N 22026 1019 2 Edition October 2019 Data in this document is subject to change wit...

Reviews: