Flex’ion®
Figure 4: System overview of standard, 2-wire architecture
of multi-string system
Figure 5: System overview of midpoint, 3-wire architecture of
multi-string system
Page 1: ...t expose the unit to water or condensation Install the batteries in an area compatible with pollution level 2 according to EN 60664 1 typical of office or laboratory environments Do not place the batt...
Page 2: ...tteries If the Li ion battery module is identified as being damaged or defective has leaked sustained physical or mechanical damage or is defective for a safety reason it shall be packed in accordance...
Page 3: ...port to BMM 02 etc refer to Figure 6 Connect the MBMM signals to the customer s application when requested Connect the electrical power cables between battery modules BMM and Intelli Connect using ins...
Page 4: ...1 C P MFe Battery modules 11 D I C Intelli Connect with Master BMM 1 E CAB Signal and power cables 1 F DOC Documentation set 1 actual configuration is subject to design parameters Figure 3 Configurati...
Page 5: ...Flex ion Figure 4 System overview of standard 2 wire architecture of multi string system Figure 5 System overview of midpoint 3 wire architecture of multi string system...
Page 6: ...ge of modules Figure 8 BMM overview Figure 9 POWER ON main switch IMPORTANT Full instructions are provided in the Flex ion Installation Commissioning available to installation engineers certified by S...
Page 7: ......
Page 8: ...orth Haven Connecticut 06492 United States of America Tel 1 203 985 2700 Fax 1 203 985 2739 www saftbatteries com Doc N 22026 1019 2 Edition October 2019 Data in this document is subject to change wit...