STEP • 22
STEP •23
15
PLANTER BOXES
= Drill Points using
screws provided as shown
x2
4.0 x 70mm
Per Floor Section
x3
x2
4.0 x 70mm
Per Floor Section
x3
x10
x8
4.0 x 70mm
4.0 x 38mm
DIAMOND CAPS
ATTACH PLANTERS
Attach Planter Boxes.
Final steps finishing off
the Summer Shed.
22a.
Align the Planter boxes around 50mm Below the windows on each window panel. (Theses
can be adjusted to your desired Height)
22b.
Use Screws to secure the Planter Boxes in place. (2 Screws per 2ft Planter box, 3 Screws per
3ft/4ft Planter Box).
YOU’RE ALMOST DONE
BUILDING YOUR SHED...
REMINDER
:
TAKE CAUTION - when fixing the planter
boxes onto the shed. Make sure you are not
screwing into the glass on the panel behind.
DIAMOND CAPS
Add the Finishing
Touch. (Optional)
Timber is a naturally grown product and may shrink and warp when dried out, timber is a porous
material which can absorb water. Although all of our buildings come pressure treated we strongly
advise the building is re-treated with an oil/spirit based treatment inside and out to make the timber
water repellent and to preserve the quality and life of the product.
Congratulations