  Installation of R410A refrigerant air 

conditioner

 CAUTION

New refrigerant air conditioner installation

• 

This air conditioner adopts the new HFC refrigerant (R410A) which does not destroy ozone layer.

R410A refrigerant is apt to be affected by impurities such as water, oxidizing membrane, and oils because the 
working pressure of R410A refrigerant is approx. 1.6 times as that of refrigerant R22. Accompanied with the 
adoption of the new refrigerant, the refrigerant oil has also been changed. Therefore, during installation work, 
be sure that water, dust, former refrigerant, or refrigerant oil does not enter the new type refrigerant R410A air 
conditioner cycle.
To prevent mixing of refrigerant or refrigerant oil, the sizes of connecting sections of charging port on main unit 
and installation tools are different from those of the conventional refrigerant units. Accordingly, special tools are 
required for the new refrigerant (R410A) units. For connecting pipes, use new and clean piping materials with 
high pressure fittings made for R410A only, so that water and/or dust does not enter.

■ 

Required tools / Equipment and precautions for use

Prepare the tools and equipment listed in the following table before starting the installation work.

 : R410A exclusive

 : Generic

Tools/equipment

Use

Manifold gauge*

Vacuuming/charging refrigerant 
and operation check

Charging hose

Gas leak detector

Gas leak check

Vacuum pump with backflow 
prevention function

Vacuum drying

Flare tool

Flare machining of pipes

 Usable if dimensions are adjusted.

Bender

Bending pipes

Refrigerant recovery equipment

Refrigerant recovery

Torque wrench

Tightening flare nuts

 Ø1/2” (12.7 mm) and Ø5/8” (15.9 mm)

Pipe cutter

Cutting pipes

Brazing torch and nitrogen 
cylinder

Braze pipes

Refrigerant charging scales

Charging refrigerant

4 mm hexagon wrench

Opening liquid valve

4

 Installation 

conditions

■ 

Before installation

Be sure to prepare to the following items before 
installation.

Length of refrigerant pipe

Model

Length of 

refrigerant 

pipe 

connected 

to indoor / 

outdoor unit

Item

RAV-SP242AT2P-UL

16'5" to 164'1" 

(5 to 50 m)

Addition of refrigerant 
at the local site in 
unnecessary for 
refrigerant pipe lengths 
up to 98'5" (30 m). 
If the reftigerant pipe 
length exceeds 98'5" 
(30 m).
Add refrigerant in 
the amount given in 
“Charging additional 
refrigerant”.

Caution during addition of refrigerant.
Charge the refrigerant accurately. Overcharging 
may cause serious trouble with the compressor.

• 

Do not connect a refrigerant pipe that is shorter than 

16'5" (5 m)

.

This may cause a malfunction of the compressor or 
other devices.

Leakage test

1. Before starting a leakage test, further tighten the 

spindle valves on the gas and liquid sides.

2. Pressurize the pipe with nitrogen gas charged from 

the service port to the design pressure (4.15 MPa) 
to conduct a leakage test.

3. After the leakage test is completed, evacuate the 

nitrogen gas.

Evacuation

• 

To evacuate system, use a vacuum pump.

• 

Do not use refrigerant charged in the outdoor unit 
for evacuation. 

Electrical wiring

• 

Be sure to 

fi

 x the power wires and system 

interconnection wires with clamps so that they do 
not come into contact with the cabinet, etc.

Grounding

 WARNING

Make sure that proper grounding is provided.

Improper grounding may cause an electric shock. 
For details on how to check grounding, contact 
the dealer who installed the air conditioner or a 
professional installation company.

• 

Proper grounding can prevent charging of electricity 
on the outdoor unit surface due to the presence of a 
high frequency in the frequency converter (inverter) 
of the outdoor unit, as well as prevent electric shock.
If the outdoor unit is not properly earthed, you may 
be exposed to an electric shock.

• 

Be sure to connect the earth wire. (grounding 
work)

Incomplete grounding can cause an electric shock.
Do not connect ground wires to gas pipes, water 
pipes, lightning rods or ground wires for telephone 
wires.

Test run

Turn on the leakage breaker at least 12 hours before 
starting a test run to protect the compressor during 
startup.

 CAUTION

Incorrect installation work may result in a malfunction 
or complaints from customers.

EN

TH

ID

11-EN

12-EN

1131601101 EN FR ES.indb   6

1131601101 EN FR ES.indb   6

4/8/2565 BE   10:14

4/8/2565 BE   10:14

Summary of Contents for RAV-SP242AT2P-UL

Page 1: ...door Unit Model name For commercial use Pour usage commercial Para uso comercial Heat Pump Model RAV SP242AT2P UL 1131601101 English Installation Manual 1 English 1131601101 EN FR ES indb 1 1131601101 EN FR ES indb 1 4 8 2565 BE 10 14 4 8 2565 BE 10 14 ...

Page 2: ...er uses R410A an environmentally friendly refrigerant Contents 1 Precautions for safety 3 2 Accessory parts 5 3 Installation of R410A refrigerant air conditioner 6 4 Installation conditions 6 5 Refrigerant piping 9 6 Vacuum 10 7 Electrical work 12 8 Grounding 13 9 Finishing 13 10 Test run 13 11 Annual maintenance 13 12 Functions to be implemented locally 14 13 Troubleshooting 16 14 Appendix 17 15 ...

Page 3: ...s a person who installs repairs maintains relocates and removes the air conditioners made by Manufacturer He or she has been trained to install repair maintain relocate and remove the air conditioners made by Manufacturer or alternatively he or she has been instructed in such operations by an individual or individuals who have been trained and is thus thoroughly acquainted with the knowledge relat...

Page 4: ...autions in the literature and on tags stickers and labels attached to the equipment Follow all safety codes Wear safety glasses and work gloves Keep quenching cloth and fire extinguisher nearby when brazing Use care in handling rigging and setting bulky equipment Read these instructions thoroughly and follow all warnings or cautions included in literature and attached to the unit Consult local bui...

Page 5: ...t gas has leaked during the installation work ventilate the room immediately If the leaked refrigerant gas comes in contact with fire noxious gas may be generated After the installation work confirm that refrigerant gas does not leak If refrigerant gas leaks into the room and flows near a fire source such as a cooking range noxious gas may be generated Electrical work must be performed by a qualif...

Page 6: ...ause burst and injure CAUTION Do not climb onto or place objects on top of the outdoor unit You may fall or the objects may fall off of the outdoor unit and result in injury Wear heavy gloves during the installation work to avoid injury EQUIPMENT DAMAGE HAZARD Failure to follow this caution may result in equipment damage or improper operation Do not bury more than 36 in 914 mm of refrigerant pipe ...

Page 7: ...ected to indoor outdoor unit Item RAV SP242AT2P UL 16 5 to 164 1 5 to 50 m Addition of refrigerant at the local site in unnecessary for refrigerant pipe lengths up to 98 5 30 m If the reftigerant pipe length exceeds 98 5 30 m Add refrigerant in the amount given in Charging additional refrigerant Caution during addition of refrigerant Charge the refrigerant accurately Overcharging may cause serious...

Page 8: ...n where the operating noise of the outdoor unit is transmitted When the outdoor unit is installed in an elevated position be sure to secure its feet A location in which drain water poses any problems When an outdoor unit is installed in a location that is always exposed to strong winds like a coast or on the high stories of a building one of the following is recommended Install the unit so that it...

Page 9: ...m or less 3 Place unit on stand Make sure it is level and fasten securely to the stand As shown in the figure below install the foundation and vibration proof rubber pads to directly support the bottom surface of the fixing leg that is in contact with the bottom plate of the outdoor unit When installing the foundation for an outdoor unit with downward piping consider the piping work GOOD GOOD NO G...

Page 10: ...g diameter size A Unit in mm Outer diameter of copper pipe A 0 0 02 0 4 3 8 9 5 0 52 13 2 5 8 15 9 0 78 19 7 In case of flaring for R410A with the conventional flare tool pull the tool out approx 0 02 0 5 mm more than that for R22 to adjust it to the specified flare size The copper pipe gauge is useful for adjusting the projection margin size A Tightening of Flare Connections 1 Align the centers o...

Page 11: ...ovides the power for the indoor unit as well as the communication signal between the outdoor and indoor unit System interconnection wire size must be AWG16 Breaker must have a capacity specified in the following table All wiring must comply with local electric codes and NEC National Electric Code or CEC Canadian Electric Code Model RAV SP242 Power supply 208 230 V 60 Hz MCA 17 A MOCP MAX Fuse CB 2...

Page 12: ...ion Method chart EVACUATE BREAK VACUUM WITH DRY NITROGEN WAIT EVACUATE BREAK VACUUM WITH DRY NITROGEN WAIT EVACUATE CHECK FOR TIGHT DRY SYSTEM IF IT HOLDS DEEP VACCUM RELEASE CHARGE INTO SYSTEM Final Tubing Check IMPORTANT Check to be certain factory tubing on both indoor and outdoor unit has not shifted during shipment Ensure tubes are not rubbing against each other or any sheet metal Pay close a...

Page 13: ...lowing table All wiring must comply with local electric codes and NEC National Electric Code or CEC Canadian Electric Code Model RAV SP242 Power supply 208 230 V 60 Hz MCA 17 A MOCP MAX Fuse CB 25 A Breaker 20 A System interconnection wires AWG16 Field power supply wire AWG12 MCA Minimum Circuit Amps MOCP Maximum Over Protection Device Amps Connect the system interconnection indoor to outdoor wire...

Page 14: ...d piping 10Test run Turn on the leakage breaker at least 12 hours before starting a test run to protect the compressor during startup To protect the compressor power is supplied from the 208 230 VAC input to the unit to preheat the compressor Check the following before starting a test run That all pipes are connected securely without leaks That the valve is open If the compressor is operated with ...

Page 15: ...4 Yellow D805 Green or or or or or OFF or Rapid flashing OFF or Rapid flashing OFF or Rapid flashing OFF or Rapid flashing OFF or Rapid flashing ON 12Functions to be implemented locally Handling existing pipe When using the existing pipe carefully check for the following Wall thickness within the specified range Scratches and dents Water oil dirt or dust in the pipe Flare looseness and leakage fro...

Page 16: ... least 5 seconds to return to the initial status and then repeat the setting steps Steps taken to recover the refrigerant 1 Operate the indoor unit in the fan mode 2 Check that the LED displays are placed in their initial status If not place them in the initial status 3 Hold down SW01 for at least 5 seconds and check that D804 flashes slowly Fig 1 4 Press SW01 once to set the LED displays D800 to ...

Page 17: ...ou can check whether the existing piping settings are enabled 1 Check that the LED displays are placed in their initial status If not place them in the initial status 2 Hold down SW01 for at least 5 seconds and check that D804 flashes slowly Fig 9 3 Press SW01 four times to set the LED displays D800 to D805 to the LED displays for existing piping settings shown below If the setting is enabled D802...

Page 18: ...ness R410A 0 03 0 8 0 04 1 0 3 When the outdoor unit was left with the pipes disconnected or the gas leaked from the pipes and the pipes were not repaired and refilled There is the possibility of rain water or air including moisture entering the pipe 4 When refrigerant cannot be recovered using a refrigerant recovery unit There is the possibility that a large quantity of dirty oil or moisture rema...

Page 19: ...o prevent the writing from rubbing off 3 Prevent emission of the contained fluorinated greenhouse gas Ensure that the fluorinated greenhouse gas is never vented to the atmosphere during installation service or disposal When any leakage of the contained fluorinated greenhouse gas is detected the leak shall be stopped and repaired as soon as possible 4 Only qualified service personnel are allowed to...

Page 20: ...4 9 Moo 5 Bangkadi Industrial Park Tivanon Road Tambol Bangkadi Amphur Muang Pathumthani 12000 Thailand 1131601101 1131601101 EN FR ES indb 2 1131601101 EN FR ES indb 2 4 8 2565 BE 10 14 4 8 2565 BE 10 14 ...

Reviews: