3.10 Async Test
3 Tests and Diagnostics
PORTEGE M100 Maintenance Manual (960-452)
3-25
Subtest 02
Point to point (send)
NOTE
: To execute this subtest, two machines must be connected with an RS-232C direct
cable. One machine should be set as “send”(subtest 02) and the other set as
“receive” (subtest 03). The wiring diagram for the RS -232C direct cable is
described in Appendix F.
This subtest sends 20h through 7Eh data to the receive side, then receives the sent
data and compares it to the original data.
Subtest 03
Point to point (receive)
This subtest is used with subtest 02 described above. This subtest receives the data
from the send side, then sends the received data.
Subtest 04
Interrupt Test
This subtest checks the IRQ (Interrupt Request) level 4, 3 and 5 from the send side.
Subtest 06
FIR/SIR Point to point (send)
NOTE:
To execute subtests 06 and 07, each computer must have access to the other
computer’s infrared port.
This subtest sends 20h through 7Eh data to the receive side, then receives the sent
data and compares it to the original data through the FIR/SIR port.
Subtest 07
FIR/SIR Point to point (receive)
This subtest is used with subtest 06 described above. This subtest receives the data
from the send side, then sends the received data through the FIR/SIR port.
Summary of Contents for Portege M100
Page 8: ...viii PORTEGE M100 Maintenance Manual 960 452 3 29 IEEE1394 Test Program 3 91 ...
Page 11: ...PORTEGE M100 Maintenance Manual 960 452 xi ...
Page 12: ...Chapter 1 Hardware Overview ...
Page 13: ...1 Hardware Overview 1 ii PORTEGE M100 Maintenance Manual 960 452 ...
Page 36: ...Chapter 2 Troubleshooting Procedures ...
Page 37: ...2 Troubleshooting Procedures 2 ii PORTEGE M100 Maintenance Manual 960 452 ...
Page 42: ...2 Troubleshooting Procedures PORTEGE M100 Maintenance Manual 960 452 2 vii ...
Page 102: ...Chapter 3 Tests and Diagnostics ...
Page 103: ...3 Tests and Diagnostics 3 ii PORTEGE M100 Maintenance Manual 960 452 ...
Page 107: ...3 Tests and Diagnostics 3 vi PORTEGE M100 Maintenance Manual 960 452 ...
Page 140: ...3 Tests and Diagnostics 3 14 Expansion Test 3 32 PORTEGE M100 Maintenance Manual 960 452 ...
Page 160: ...3 23 SETUP 3 Tests and Diagnostics PORTEGE M100 Maintenance Manual 960 452 3 51 13 PC Card ...
Page 204: ...Chapter 4 Replacement Procedures ...
Page 205: ...4 Replacement Procedures 4 ii PORTEGE M100 Maintenance Manual 960 452 ...
Page 313: ...Appendices Appendices ...
Page 314: ...Appendices App ii PORTEGE M100 Maintenance Manual 960 452 ...
Page 320: ...Appendices App viii PORTEGE M100 Maintenance Manual 960 452 ...
Page 326: ...Appendices Appendix A Handling the LCD Module A 6 PORTEGE M100 Maintenance Manual 960 452 ...
Page 336: ...Appendices Appendix B Board Layout B 10 PORTEGE M100 Maintenance Manual 960 452 ...
Page 382: ...Appendices Appendix G BIOS Rewrite Procedures G 2 PORTEGE M100 Maintenance Manual 960 452 ...
Page 384: ...Appendices Appendix H EC KBC Rewrite Procedures H 2 PORTEGE M100 Maintenance Manual 960 452 ...
Page 386: ...Appendices Appendix I Reliability I 2 PORTEGE M100 Maintenance Manual 960 452 ...