Startup and Test
Before turning on the ASD, ensure that:
•
R/L1
,
S/L2
, and
T/L3
are connected to the 3-phase input power.
•
U/T1
,
V/T2
, and
W/T3
are connected to the motor.
• The 3-phase input voltage is within the specified tolerance.
• There are no shorts and all grounds are secured.
• All personnel are at a safe distance from the motor and the motor-driven equipment.
Use the following table to record any changed parameters for future reference.
Table 3. ASD Parameter Changes by Installer/Maintenance Personnel.
ASD ID__________Name:______________________Date:_______
Notes
Parameter
Number
Parameter Name
Default or
Previous
Setting
New Setting
Unit of
Measure
Note:
Settings may also be recorded via Program
Utilities
Type Reset
DANGER
Summary of Contents for P9
Page 2: ......
Page 3: ...Document Number 64054 004 February 2013 P9 ASD Installation Operation Manual TM ...
Page 4: ......
Page 305: ......