background image

 

 

E6581371

c

 

3.2.  VF-FS1 communication parameters 

Set up the inverter parameters as follows. To update, reset the power of inverter. If these parameters 
are not set to correct value, this unit can not work normally. 

 

Title Function 

Description 

cmod 

Command mode selection 

fmod 

Setpoint mode selection 

While L

ON

W

ORKS 

communication option is installed 

into VF-FS1, The network command and setpoint are 
prior to 

cmod

/

fmod

. VF-FS1 front panel operation 

is prior when LOC lamp on the front panel turns on. 

f800 

Communication speed 

Set “

1

: 19200bps” (default). 

f801 

Parity Set 

1

: Even” (default). 

f803 

Communication error trip time

Set communication time out period. 

f829 

Communication protocol 

Set “

1:

 MODBUS-RTU”

 

f851 

Operation at network error 

Set the behavior when “Receive heart beat timer” 
overflow occurred. 

 

 

Warning

 

 

Mandatory 

 

Set up “Communication error trip function (

f803

, see the inverter instruction 

manual for details)” to stop the inverter when this option unit is deactivated by an 
unusual event such as tripping, an operating error, power outage, failure, etc.  
Deactivated option unit may cause an accident, if the “Communication error trip 
function” is not properly set up. 

 

3.3.  Network cable connection 

Connect the L

ON

W

ORKS 

network cable to L

ON

W

ORKS

 communication option as follows. 

(1) Cable selection (a twisted pair cable with shield) 

Use Level 4/22 AWG cable for the network cable. 

- Recommended cable   

Manufacturer: Showa Electric Wire & Cable Co., Ltd. 

Model name:  LW221S, 22AWG, 1P, With shield, Standard 300m/reel 

Use 0.75mm

2

 wire for grounding to the earth terminal (G/E) of the board. 

(2) Terminal blocks 

NETA

SHLD

NETB

Catches

Manufacturer: PHOENIX CONTACT
Model name: MSTB 2,5/3-ST-5.08

 

- Communication terminal NETA, NETB 

Connect L

ON

W

ORKS 

transmission/reception data cable. 

Polarity of the communication terminals NETA and NETB does not have to be considered. 

- Communication shield terminal SHLD 

Connect the shield of network cable. Refer to next section for grounding. 

- G/E terminal 

Connect the network ground. 

(3) Connection 

Cable sheath should be peeled off by about 7mm.

 

For wiring work, use a flat blade screwdriver with a 0.6mm thick and 3.5mm width blade.

  

Tightening torque for the terminal block is 0.5Nm.

  

 

- 9 - 

Summary of Contents for LONWORKS LIU007Z

Page 1: ... is delivered to the end user of LONWORKS communication option 2 Read this manual before installing or operating the LONWORKS communication option Keep it in a safe place for reference 3 All information contained in this manual are subject to change without notice Please confirm the latest information on our web site www inverter co jp ...

Page 2: ...injury 1 to people or that these errors may cause damage to physical property 2 1 Such things as injury burns or shock that will not require hospitalization or long periods of outpatient treatment 2 Physical property damage refers to wide ranging damage to assets and materials Meanings of symbols Marking Meaning of marking Indicates prohibition Do not do it What is prohibited will be described in ...

Page 3: ...discharge sensitive device Handle it where the environment is protected against electrostatic electricity Otherwise permanent damage to device will result Mandatory Transportation and installation Danger Do not apply a dropping shock or other physical shocks Otherwise damage or malfunction will result Do not install or operate the inverter if it is damaged or any part of it is missing Operating a ...

Page 4: ...ime f803 see the inverter instruction manual for details Receive heart beat timer See the VF FS1 LONWORKS Communication Function Manual for details Deactivated option unit may cause an accident if the Communication error trip function is not properly set up Make sure that the operation signals are STOP before clearing the inverter s fault The motor may suddenly start and that may result in injurie...

Page 5: ...this instruction manual please keep it handy for future reference Echelon LONWORKS LonTalk Neuron LONMARK LONMARK Logo are the registered trademarks or the trademarks of Echelon Corporation in the USA and other countries LONMARK and LONMARK Logo are managed granted and used by LONMARK International under a license granted by Echelon Corporation Part numbering LIU 007 Z 0 Revision number Cable leng...

Page 6: ...minals 7 3 Installation and Setup 8 3 1 Installation method 8 3 2 VF FS1 communication parameters 9 3 3 Network cable connection 9 3 4 Network configuration 10 3 5 Termination resistor 11 3 6 Wiring of a control terminal 11 4 Before making a service call 12 4 1 Display of service LED 12 4 2 Other problems 12 5 Specifications 13 6 Warranty 14 5 ...

Page 7: ...ate Service switch only when a cover for the main circuit terminal is attached Otherwise it may lead to electric shocks Operate Service switch using the non conductive stick When it is operated with a conductive stick Otherwise it may lead to electric shocks 2 2 Use of RS485 communication port Serial communication 2 wire RS485 option can be used However while it is connected the internal communica...

Page 8: ... SINK 820 VIB Multifunction programmable analog input with internal pull up resistor for PTC 0 to 10VDC input Using this terminal as PTC input set SW1 to PTC side and set the parameters f645 and f646 to proper value VIB 15k VIB P10 PTC 15k 3 3k CC Control circuit s equipotential terminal P24 24 VDC power supply output 24VDC 50mA P24 P24 PTC FLA FLB FLC Multifunctional programmable relay contact ou...

Page 9: ...stall the LONWORKS communication option over the insulating sheet and secure it with the board fixing screw tightening torque of M3 tapping screw 0 7 to 0 8Nm 6 Stick the cabling label for LONWORKS communication option on the standard cabling label stuck on the reverse side of the VF FS1 front cover And stick the LONWORKS communication option nameplate near the standard nameplate Be careful not to...

Page 10: ...s tripping an operating error power outage failure etc Deactivated option unit may cause an accident if the Communication error trip function is not properly set up 3 3 Network cable connection Connect the LONWORKS network cable to LONWORKS communication option as follows 1 Cable selection a twisted pair cable with shield Use Level 4 22 AWG cable for the network cable Recommended cable Manufacture...

Page 11: ...opology total wire length is 1400m or less stub length is 3m or less Twisted pair cable with shield Host computer Router LIU007Z Terminal resistor 52 3ohm 1 8W Shield grounding resistor NETA NETB SHLD LIU007Z NETA NETB SHLD LIU007Z NETA NETB SHLD Terminal 1 Terminal 2 Connection image Network configuration is shown in the figures below This LONWORKS communication option has TP FT 10 channel type t...

Page 12: ...ove the sheath of a cable about 7mm 6mm for FLA FLB FLC and G E from the end of cable Use a flat headed screwdriver with its blade 0 6mm in thickness and 3 5mm in width Screw tightening torque for the terminal block screws should be 0 5 to 0 6Nm N B Keep the control signal cables 20cm or more separate from the power cables to prevent from malfunctioning due to electromagnetic noise N B Provide an ...

Page 13: ...ame indication appears after resetting the power it needs to be repaired 5 LED blinks every 1 second This is a normal action of the Unconfigured device If the device is not Unconfigured Internal application program is broken It needs to be repaired 6 LED momentarily turns ON then continues to be OFF When the program is in the condition of Configured status LED momentarily turns ON when the inverte...

Page 14: ... Power supply output 24V 50mA Current limit function DC Network side Item Specification Notes Transceiver TP FT 10 type 78kbps Channel type Free topology transceiver ANSI EIA CEA 709 3 Communication signal 2 wires plus shield NETA SHLD NETB Transmission distance Between devices 400m at maximum When recommended cable is used Free topology Total cable length 500m at maximum Level 4 22AWG Total cable...

Page 15: ...r damage the repair cost shall be borne by the customer even within the warranty period i Failure or damage caused by improper or incorrect use or handling or unauthorized repair or modification of the inverter ii Failure or damage caused by the unit falling or an accident during transportation after the purchase iii Failure or damage caused by fire salty water or wind corrosive gas earthquake sto...

Reviews: