background image

Incomplete grounding causes an electric shock.

Do not connect earth wires to gas pipes, water pipes, and lightning conductor or telephone earth wires.

After completing the repair or relocation work, check that the earth wires are connected properly.

Install a circuit breaker that meets the specifications in the installation manual and the stipulations in the local regulations

 

and laws.

Install the circuit breaker where it can be easily accessed for service.

When installing the circuit breaker outdoors, install one which is designed to used outdoors.

T

he power wire must not be extended. Connection trouble in the places where the wire is

 

extended

 may result in smoking 

and/or fire

.

Electrical wiring work shall be conducted according to law and regulation in the community and installation manual.

 

Failure to do so may result in electrocution or short circuit.

Test run 

Before operating the air conditioner after having completed the work, check that the electrical cover box and service panel

of outdoor unit are closed, and set the circuit breaker to the ON position. There is probability electric shock if the power
is turned on without first conducting these checks. 

If there is any kind of trouble (such as an error display appearing, smell of burning, abnormal sounds, the air conditioner

fails to cool or heat or water is leaking) has occurred in the air conditioner, do not touch the air conditioner yourself but
set the circuit breaker to the OFF position, and contact a qualified service person. Take steps to ensure that the power 
will not be turned on (by marking “out of service” near the circuit breaker, for instance) until qualified service person 
arrives. Continuing to use the air conditioner in this status may cause mechanical problems to escalate or result in 
electric shocks or other trouble.  

After the work has finished, use an insulation tester set (500V Megger) to check the resistance is 1M ohm or more

between the charge section and the non-charge metal section (Earth section). If the resistance value is low, a disaster
such as a leak or electric shock is caused at user’s side. 

Upon completion of the installation work, check for refrigerant leaks and check the insulation resistance and water

drainage. Then conduct a test run to check that the air conditioner is operating properly.

Explanations given to user 

Upon completion of the installation work, tell the user where the circuit breaker is located. If the user does not know where

the circuit breaker is, he or she will not be able to turn it off in the event that trouble occurs in the air conditioner.

After the installation work, follow the Owner’s manual to explain to the customer how to use and maintain the unit.

Relocation 

Only qualified installer or qualified service person is allowed to relocate the air conditioner. It is dangerous for the air

conditioner to be relocated by an unqualified individual since a fire, electric shocks, injury, water leakage, noise and/or
vibration may result. 

When carrying out the pump-down work, shut down the compressor before disconnecting the refrigerant pipe.

Disconnecting the refrigerant pipe with the service valve left open and the compressor still operating will cause air or
other gas to be sucked in, raising the pressure inside the refrigeration cycle to an abnormally high level, and possibly 
resulting in rupture, injury or other issues. 

 

THIS AIR CONDITIONER ADOPTS THE NEW HFC REFRIGERANT (R410A) WHICH DOES NOT DESTROY OZONE 
LAYER.

 

The characteristics of R410A refrigerant are; easy to absorb water, oxidizing membrane or oil, and its pressure is approx.  
1.6 times higher than that of refrigerant R22. Accompanied with the new refrigerant, refrigerating oil has also been changed. 
Therefore, during installation work, be sure that water, dust, former refrigerant, or refrigerating oil does not enter the 
refrigerating cycle. 
To prevent charging an incorrect refrigerant and refrigerating oil, the sizes of connecting sections of charging port of  
the main unit and installation tools are changed from those of conventional refrigerant. 
Accordingly the exclusive tools are required for the new refrigerant (R410A). 
For connecting pipes, use new and clean piping designed for R410A, and please take care so that water or dust does not  
enter the system. Moreover, do not use the existing piping because there are problems with the pressure-resistance force  
and impurity in it. 

New Refrigerant Air Conditioner Installation 

Summary of Contents for Carrier RBM-A0121GUL

Page 1: ... RBM A0121GUL RBM A0301GUL RBM A0601GUL RBM A0961GUL RBM A1921GUL Dx PMV kit 012type Dx PMV kit 030type Dx PMV kit 060type Dx PMV kit 096type Dx PMV kit 192type Dx Interface Dx PMV kit Installation manual ENGLISH ...

Page 2: ... NEW REFRIGERANT This Air Conditioner is a new type which adopts a new refrigerant HFC R410A instead of the conventional refrigerant R22 in order to prevent destruction of the ozone layer This appliance is for commercial use only and should not be accessible to the general public This appliance is not intended for use by person including children with reduced physical sensory or mental capabilitie...

Page 3: ...wise it may cause imperfect combustion Installation Install the air conditioner securely in a location where the base can sustain the weight adequately If the strength is not enough the unit may fall down and result in injury Carry out the specified installation work to guard against the possibility of high winds and earthquake If the air conditioner is not installed appropriately a unit may toppl...

Page 4: ...of the installation work check for refrigerant leaks and check the insulation resistance and water drainage Then conduct a test run to check that the air conditioner is operating properly Explanations given to user Upon completion of the installation work tell the user where the circuit breaker is located If the user does not know where the circuit breaker is he or she will not be able to turn it ...

Page 5: ...Control wiring Field installed Temperature sensor wiring SPECIFICATION 1 Install in the place avoiding direct sunlight and rain Model name RBM A 0121UL 0301GUL 0601GUL 0961GUL 1921GUL Capacity Code 012 015 018 021 024 030 036 042 048 060 072 096 168 192 Ton 1 1 25 1 5 1 75 2 2 5 3 3 5 4 5 6 8 14 16 Maximum capacity kBtu h 12 15 4 18 21 24 30 36 42 48 60 72 96 168 192 Power supply requirements Powe...

Page 6: ...4 sizes Model Name Weight lbs Dimension inch Net Gross W1 W2 H D RBM A0121GUL RBM A0301GUL RBM A0601GUL RBM A0961GUL RBM A1921GUL 6 0 6 5 8 4 9 8 15 7 3 2 4 PART DESCRIPTION No Parts name Quantity 1 Cover box 1 2 Base box 1 3 Bracket 1 4 Terminal box 1 5 Cable Gland 3 6 Insulator tube 1 7 PMV Assembly PMV Strainer Pipe 1 8 Support tie wrap 1 9 Pipe cap 2 ...

Page 7: ...n Remove the pipe cap Prepare the inlet outlet field piping just in front of the connection Do not braze yet If connecting capacity is 015 or 018 type using RBM A301GUL be sure to use the reducer pipe for both brazing Connecting pipe size is 1 4 for 015 and 018 type Capacity Pipe size 012 018 1 4 021 060 3 8 072 096 1 2 168 192 5 8 Model name RBM A 0121UL 0301GUL 0601GUL 0961GUL 1921GUL Capacity C...

Page 8: ...rk to prevent internal oxidization C Prevent cooling water from getting inside the PMV valve and connector of the lead during brazing D Take care not to damage the PMV cables during brazing E The leakage test is executed by pressurizing nitrogen gas up to 601 psi 4 15MPa The test must be done with the service valve of the outdoor unit closed and the gas must be pressurized at the liquid pipe gas p...

Page 9: ...wiring RBM A1681GUL 5 wiring Use the screwdriver and follow indicated instructions for connecting cable wires into the terminal connector according to the circuit diagram Make sure that field wiring and insulation is not pinched when closing the Dx PMV kit cover box Close the Dx PMV kit cover box by 4 screw Terminal number Colour RBM A0121GUL A0301GUL A0601GUL A0961GUL RBM A1921GUL PMV1 PMV2 L01 L...

Page 10: ...ote Temperature sensor is packed in Dx Controller TCB IFDA1GUL TCB IFDD1GUL TC1 Ø4mm Sleeve colour Blue Install the temperature sensor at the outlet of the heat exchanger as close as possible to the heat exchanger TC2 Ø6mm Sleeve colour Black Install the temperature sensor between the distributor and PMV TCJ Ø6mm Sleeve colour Red Install the temperature sensor hehind of the distributor on the low...

Page 11: ...oisture to accumulate on the sensor or penetrate the conductor insulation Make a good connection between temperature sensor and Dx coil Put the top of the thermistors on the Dx Coil this is the most sensitive point of the sensor 1 Most sensitive part of the sensor 2 Maximize the contact with pipe TC1 Sensor Ø4 Small Sensor Holder Gas Header Pipe Avoid positioning Sensor holders in the Drain Pan wh...

Page 12: ...11 160003R04 UL Rev 2 Carrier Corporation Carrier Ductless and VRF Atlanta Georgia United States ...

Reviews: