–
95
–
No.
2
Part name
High voltage generator
(only in model
RAS-18, 22 SKVR-E)
Procedures
1) Follow to the procedure in the
item
1
.
2) To remove the air ionizer from
the back body, pull it toward you.
Remarks
3) Disconnect the connectors of
the high voltage generator.
4) Remove the fixing screws
(2 pcs) and remove the high
voltage generator from the
evaporator.
1) Insert the high voltage
generator straight into the
evaporator voltage generator
from the evaporator.
2) Secure it using the fixing
screws. (2 pcs)
3) Connect the connectors of the
high-voltage generator
4) Attach the air ionizer to the back
body.
2 screws
Connectors
2 screws
Connectors
<How to assemble the high voltage generator>
FILE NO. SVM-10050